Capri Holdings (CPRI) Construction in Progress (2016 - 2025)
Capri Holdings has reported Construction in Progress over the past 14 years, most recently at $10.0 million for Q4 2025.
- Quarterly results put Construction in Progress at $10.0 million for Q4 2025, down 66.67% from a year ago — trailing twelve months through Dec 2025 was $10.0 million (down 66.67% YoY), and the annual figure for FY2025 was $18.0 million, down 78.05%.
- Construction in Progress for Q4 2025 was $10.0 million at Capri Holdings, down from $13.0 million in the prior quarter.
- Over the last five years, Construction in Progress for CPRI hit a ceiling of $101.0 million in Q3 2023 and a floor of $10.0 million in Q4 2025.
- Median Construction in Progress over the past 5 years was $50.5 million (2021), compared with a mean of $54.0 million.
- Biggest five-year swings in Construction in Progress: skyrocketed 112.2% in 2022 and later crashed 78.05% in 2025.
- Capri Holdings' Construction in Progress stood at $49.0 million in 2021, then soared by 85.71% to $91.0 million in 2022, then crashed by 30.77% to $63.0 million in 2023, then plummeted by 52.38% to $30.0 million in 2024, then crashed by 66.67% to $10.0 million in 2025.
- The last three reported values for Construction in Progress were $10.0 million (Q4 2025), $13.0 million (Q3 2025), and $19.0 million (Q2 2025) per Business Quant data.