KPIs & Operating Metrics(New)
Growth Metrics

Capri Holdings (CPRI) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Capri Holdings (CPRI) over the last 15 years, with Q4 2025 value amounting to $10.0 million.

  • Capri Holdings' Construction in Progress fell 6666.67% to $10.0 million in Q4 2025 from the same period last year, while for Dec 2025 it was $10.0 million, marking a year-over-year decrease of 6666.67%. This contributed to the annual value of $18.0 million for FY2025, which is 7804.88% down from last year.
  • Capri Holdings' Construction in Progress amounted to $10.0 million in Q4 2025, which was down 6666.67% from $13.0 million recorded in Q3 2025.
  • Over the past 5 years, Capri Holdings' Construction in Progress peaked at $101.0 million during Q3 2023, and registered a low of $10.0 million during Q4 2025.
  • For the 5-year period, Capri Holdings' Construction in Progress averaged around $54.0 million, with its median value being $50.5 million (2021).
  • In the last 5 years, Capri Holdings' Construction in Progress soared by 11219.51% in 2022 and then tumbled by 7804.88% in 2025.
  • Capri Holdings' Construction in Progress (Quarter) stood at $49.0 million in 2021, then soared by 85.71% to $91.0 million in 2022, then crashed by 30.77% to $63.0 million in 2023, then tumbled by 52.38% to $30.0 million in 2024, then plummeted by 66.67% to $10.0 million in 2025.
  • Its last three reported values are $10.0 million in Q4 2025, $13.0 million for Q3 2025, and $19.0 million during Q2 2025.