Connecticut Light & Power (CNPWM) Construction in Progress (2016 - 2025)
Connecticut Light & Power has reported Construction in Progress over the past 16 years, most recently at $3.2 billion for Q4 2025.
- Quarterly results put Construction in Progress at $3.2 billion for Q4 2025, up 4.9% from a year ago — trailing twelve months through Dec 2025 was $3.2 billion (up 4.9% YoY), and the annual figure for FY2025 was $3.2 billion, up 4.9%.
- Construction in Progress for Q4 2025 was $3.2 billion at Connecticut Light & Power, down from $3.3 billion in the prior quarter.
- Over the last five years, Construction in Progress for CNPWM hit a ceiling of $3.3 billion in Q3 2025 and a floor of $1.9 billion in Q1 2021.
- Median Construction in Progress over the past 5 years was $2.9 billion (2023), compared with a mean of $2.8 billion.
- Biggest five-year swings in Construction in Progress: soared 35.51% in 2023 and later fell 1.85% in 2024.
- Connecticut Light & Power's Construction in Progress stood at $2.0 billion in 2021, then rose by 21.84% to $2.5 billion in 2022, then rose by 25.09% to $3.1 billion in 2023, then decreased by 1.85% to $3.0 billion in 2024, then increased by 4.9% to $3.2 billion in 2025.
- The last three reported values for Construction in Progress were $3.2 billion (Q4 2025), $3.3 billion (Q3 2025), and $3.2 billion (Q2 2025) per Business Quant data.