Growth Metrics

Connecticut Light & Power (CNLTP) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Connecticut Light & Power (CNLTP) over the last 16 years, with Q4 2025 value amounting to $3.2 billion.

  • Connecticut Light & Power's Construction in Progress rose 490.23% to $3.2 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $3.2 billion, marking a year-over-year increase of 490.23%. This contributed to the annual value of $3.2 billion for FY2025, which is 490.23% up from last year.
  • Per Connecticut Light & Power's latest filing, its Construction in Progress stood at $3.2 billion for Q4 2025, which was up 490.23% from $3.3 billion recorded in Q3 2025.
  • Connecticut Light & Power's Construction in Progress' 5-year high stood at $3.3 billion during Q3 2025, with a 5-year trough of $1.9 billion in Q1 2021.
  • Its 5-year average for Construction in Progress is $2.8 billion, with a median of $2.9 billion in 2023.
  • Per our database at Business Quant, Connecticut Light & Power's Construction in Progress surged by 3550.86% in 2023 and then tumbled by 184.91% in 2024.
  • Connecticut Light & Power's Construction in Progress (Quarter) stood at $2.0 billion in 2021, then grew by 21.84% to $2.5 billion in 2022, then grew by 25.09% to $3.1 billion in 2023, then decreased by 1.85% to $3.0 billion in 2024, then increased by 4.9% to $3.2 billion in 2025.
  • Its Construction in Progress stands at $3.2 billion for Q4 2025, versus $3.3 billion for Q3 2025 and $3.2 billion for Q2 2025.