Growth Metrics

Connecticut Light & Power (CNLHN) Construction in Progress (2016 - 2025)

Connecticut Light & Power has reported Construction in Progress over the past 16 years, most recently at $3.2 billion for Q4 2025.

  • For Q4 2025, Construction in Progress rose 4.9% year-over-year to $3.2 billion; the TTM value through Dec 2025 reached $3.2 billion, up 4.9%, while the annual FY2025 figure was $3.2 billion, 4.9% up from the prior year.
  • Construction in Progress for Q4 2025 was $3.2 billion at Connecticut Light & Power, down from $3.3 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $3.3 billion in Q3 2025 and troughed at $1.9 billion in Q1 2021.
  • A 5-year average of $2.8 billion and a median of $2.9 billion in 2023 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: skyrocketed 35.51% in 2023 and later dropped 1.85% in 2024.
  • Year by year, Construction in Progress stood at $2.0 billion in 2021, then grew by 21.84% to $2.5 billion in 2022, then grew by 25.09% to $3.1 billion in 2023, then fell by 1.85% to $3.0 billion in 2024, then rose by 4.9% to $3.2 billion in 2025.
  • Business Quant data shows Construction in Progress for CNLHN at $3.2 billion in Q4 2025, $3.3 billion in Q3 2025, and $3.2 billion in Q2 2025.