Cardio Diagnostics Holdings (CDIO) Construction in Progress (2023 - 2025)
Cardio Diagnostics Holdings' Construction in Progress history spans 3 years, with the latest figure at $502155.0 for Q3 2025.
- For Q3 2025, Construction in Progress changed 0.0% year-over-year to $502155.0; the TTM value through Sep 2025 reached $502155.0, changed 0.0%, while the annual FY2024 figure was $502155.0, 4.14% up from the prior year.
- Construction in Progress for Q3 2025 was $502155.0 at Cardio Diagnostics Holdings, roughly flat from $502155.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $502155.0 in Q1 2024 and bottomed at $482170.0 in Q4 2023.
- The 3-year median for Construction in Progress is $502155.0 (2024), against an average of $499656.9.
- The largest annual shift saw Construction in Progress rose 4.14% in 2024 before it changed 0.0% in 2025.
- A 3-year view of Construction in Progress shows it stood at $482170.0 in 2023, then increased by 4.14% to $502155.0 in 2024, then changed by 0.0% to $502155.0 in 2025.
- Per Business Quant, the three most recent readings for CDIO's Construction in Progress are $502155.0 (Q3 2025), $502155.0 (Q2 2025), and $502155.0 (Q1 2025).