Bristol Myers Squibb (BMY) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Bristol Myers Squibb (BMY) over the last 12 years, with Q3 2025 value amounting to $1.5 billion.
- Bristol Myers Squibb's Construction in Progress rose 651.06% to $1.5 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $1.5 billion, marking a year-over-year increase of 651.06%. This contributed to the annual value of $1.5 billion for FY2024, which is 4186.05% up from last year.
- Per Bristol Myers Squibb's latest filing, its Construction in Progress stood at $1.5 billion for Q3 2025, which was up 651.06% from $1.8 billion recorded in Q2 2025.
- In the past 5 years, Bristol Myers Squibb's Construction in Progress ranged from a high of $1.8 billion in Q2 2025 and a low of $519.0 million during Q1 2021
- Moreover, its 5-year median value for Construction in Progress was $1.1 billion (2023), whereas its average is $1.1 billion.
- As far as peak fluctuations go, Bristol Myers Squibb's Construction in Progress skyrocketed by 6992.67% in 2021, and later surged by 208.93% in 2023.
- Quarter analysis of 5 years shows Bristol Myers Squibb's Construction in Progress stood at $764.0 million in 2021, then soared by 37.83% to $1.1 billion in 2022, then increased by 2.09% to $1.1 billion in 2023, then soared by 41.86% to $1.5 billion in 2024, then decreased by 4.52% to $1.5 billion in 2025.
- Its last three reported values are $1.5 billion in Q3 2025, $1.8 billion for Q2 2025, and $1.7 billion during Q1 2025.