Bicycle Therapeutics (BCYC) Construction in Progress: 2022-2023

  • Bicycle Therapeutics' Construction in Progress was N/A to $400,000 in Q2 2023 from the same period last year, while for Jun 2023 it was $400,000, marking a year-over-year change of. This contributed to the annual value of $2.3 million for FY2022, which is N/A change from last year.
  • According to the latest figures from Q2 2023, Bicycle Therapeutics' Construction in Progress is $400,000, which was down 82.61% from $2.3 million recorded in Q4 2022.
  • In the past 5 years, Bicycle Therapeutics' Construction in Progress ranged from a high of $2.3 million in Q4 2022 and a low of $400,000 during Q2 2023.
  • For the 2-year period, Bicycle Therapeutics' Construction in Progress averaged around $1.4 million, with its median value being $1.4 million (2022).