Cash Flow Statement
Growth Metrics

Anika Therapeutics (ANIK) Construction in Progress (2016)

Anika Therapeutics has reported Construction in Progress over the past 6 years, most recently at $22.7 million for Q4 2016.

  • Quarterly Construction in Progress rose 101.3% to $22.7 million in Q4 2016 from the year-ago period, while the trailing twelve-month figure was $22.7 million through Dec 2016, up 101.3% year-over-year, with the annual reading at $22.7 million for FY2016, 101.3% up from the prior year.
  • Construction in Progress was $22.7 million for Q4 2016 at Anika Therapeutics, up from $11.3 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $22.7 million in Q4 2016 and troughed at $42270.0 in Q4 2012.
  • The 5-year median for Construction in Progress is $559000.0 (2014), against an average of $6.9 million.
  • Year-over-year, Construction in Progress tumbled 99.84% in 2012 and then skyrocketed 1916.82% in 2015.
  • A 5-year view of Construction in Progress shows it stood at $42270.0 in 2012, then soared by 272.11% to $157292.0 in 2013, then surged by 255.39% to $559000.0 in 2014, then skyrocketed by 1916.82% to $11.3 million in 2015, then soared by 101.3% to $22.7 million in 2016.
  • Per Business Quant, the three most recent readings for ANIK's Construction in Progress are $22.7 million (Q4 2016), $11.3 million (Q4 2015), and $559000.0 (Q4 2014).