Ameresco (AMRC) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Ameresco (AMRC) over the last 10 years, with Q3 2019 value amounting to $26.3 million.
- Ameresco's Construction in Progress rose 5680.14% to $26.3 million in Q3 2019 from the same period last year, while for Sep 2019 it was $26.3 million, marking a year-over-year increase of 5680.14%. This contributed to the annual value of $21.7 million for FY2018, which is 9085.16% up from last year.
- According to the latest figures from Q3 2019, Ameresco's Construction in Progress is $26.3 million, which was up 5680.14% from $23.8 million recorded in Q2 2019.
- Ameresco's 5-year Construction in Progress high stood at $26.3 million for Q3 2019, and its period low was $9.2 million during Q4 2016.
- Over the past 5 years, Ameresco's median Construction in Progress value was $15.5 million (recorded in 2015), while the average stood at $16.3 million.
- As far as peak fluctuations go, Ameresco's Construction in Progress crashed by 4116.46% in 2017, and later skyrocketed by 9085.16% in 2018.
- Ameresco's Construction in Progress (Quarter) stood at $15.5 million in 2015, then plummeted by 40.92% to $9.2 million in 2016, then rose by 23.95% to $11.4 million in 2017, then surged by 90.85% to $21.7 million in 2018, then increased by 21.13% to $26.3 million in 2019.
- Its last three reported values are $26.3 million in Q3 2019, $23.8 million for Q2 2019, and $25.8 million during Q1 2019.