Ameresco (AMRC) Construction in Progress: 2010-2019
Historic Construction in Progress for Ameresco (AMRC) over the last 9 years, with Sep 2019 value amounting to $26.3 million.
- Ameresco's Construction in Progress rose 56.80% to $26.3 million in Q3 2019 from the same period last year, while for Sep 2019 it was $26.3 million, marking a year-over-year increase of 56.80%. This contributed to the annual value of $21.7 million for FY2018, which is 90.85% up from last year.
- As of Q3 2019, Ameresco's Construction in Progress stood at $26.3 million, which was up 10.30% from $23.8 million recorded in Q2 2019.
- Ameresco's Construction in Progress' 5-year high stood at $26.3 million during Q3 2019, with a 5-year trough of $9.2 million in Q4 2016.
- Moreover, its 3-year median value for Construction in Progress was $16.1 million (2018), whereas its average is $17.5 million.
- As far as peak fluctuations go, Ameresco's Construction in Progress crashed by 41.16% in 2017, and later surged by 90.85% in 2018.
- Quarterly analysis of 5 years shows Ameresco's Construction in Progress stood at $15.5 million in 2015, then tumbled by 40.92% to $9.2 million in 2016, then grew by 23.95% to $11.4 million in 2017, then skyrocketed by 90.85% to $21.7 million in 2018, then surged by 56.80% to $26.3 million in 2019.
- Its last three reported values are $26.3 million in Q3 2019, $23.8 million for Q2 2019, and $25.8 million during Q1 2019.