Ameresco (AMRC) Construction in Progress (2016 - 2019)

Ameresco has reported Construction in Progress over the past 10 years, most recently at $26.3 million for Q3 2019.

  • Quarterly Construction in Progress rose 56.8% to $26.3 million in Q3 2019 from the year-ago period, while the trailing twelve-month figure was $26.3 million through Sep 2019, up 56.8% year-over-year, with the annual reading at $21.7 million for FY2018, 90.85% up from the prior year.
  • Construction in Progress was $26.3 million for Q3 2019 at Ameresco, up from $23.8 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $26.3 million in Q3 2019 and troughed at $9.2 million in Q4 2016.
  • The 5-year median for Construction in Progress is $15.5 million (2015), against an average of $16.3 million.
  • Year-over-year, Construction in Progress tumbled 41.16% in 2017 and then soared 90.85% in 2018.
  • A 5-year view of Construction in Progress shows it stood at $15.5 million in 2015, then tumbled by 40.92% to $9.2 million in 2016, then rose by 23.95% to $11.4 million in 2017, then soared by 90.85% to $21.7 million in 2018, then grew by 21.13% to $26.3 million in 2019.
  • Per Business Quant, the three most recent readings for AMRC's Construction in Progress are $26.3 million (Q3 2019), $23.8 million (Q2 2019), and $25.8 million (Q1 2019).