Silvercorp Metals SVM

NYSE SVM
$7.57 +0.73 (+10.67%)
At close: Nov 27, 2026 · 4:00 PM EST
Key Stats
Market Cap1.67 Bn
Enterprise Value1.49 Bn
Revenue (Yr)438.14 Mn
P/E38.52
P/FCF5.76
EV to EBIT8.98
Net Income (Yr)32.92 Mn
FCF (Yr)230.38 Mn
EPS (Diluted) (TTM)0.17
Revenue Growth (1y) (Yr)46.58%
Net Margin (Yr)-2.27%
ROA (Yr)2.53%
Add ratio to table…

About

Silvercorp Metals Inc. is a Canadian mining company engaged in the exploration, development, and production of silver, gold, lead, zinc and other metals. The company's primary operations are located in China where it runs several silver, lead, zinc mines in the Ying Mining District of Henan Province and the GC silver, lead, zinc mine in Guangdong Province. Silvercorp's strategy centers on generating free cash flow from long life mines, expanding reserves through extensive…

Read more ↓
Sector: Basic Materials Sector rationale Silvercorp Metals extracts and processes raw metals (silver, gold, lead, and zinc) and sells these concentrates to smelters and trading companies for further refining. This activity falls squarely within the Basic Materials sector, specifically under the industries for Silver, Gold, and other industrial minerals. Industries: Silver Silver Primary The company's name and business profile emphasize silver as a principal product, producing approximately 7.4 million ounces of silver across its Ying and GC mine segments in fiscal 2025. Its revenue is derived primarily from the sale of silver, lead, and zinc concentrates. Copper Copper Secondary The company produces significant quantities of base metals, specifically lead and zinc concentrates, with fiscal 2025 production including over 65 million pounds of lead and 30 million pounds of zinc. Gold Gold Secondary The company is engaged in the production of gold, yielding approximately 9,100 to 10,400 ounces from its Ying Mining District operations. Classified using BQ-MICS CIK: 0001340677
Bull & bear

Investment Thesis

▲ Bull case
  • El Domo Construction Progress

    Despite 489% above average rainfall in Ecuador, Silvercorp moved over 1 million cubic meters of material at El Domo during Q2. Plant foundations and major equipment arrivals are complete, while the on-site substation and external power line construction has commenced. Ten generators totaling 17 megawatts are staged for shipment to satisfy Ecuador's independent power requirement. The $175.5 million Wheaton streaming facility continues to fund development, with the second $44 million drawdown received this quarter. These tangible milestones de-risk the path to first production and future cash flow generation.

  • Ying District Expansion Capacity

    Permitted mining capacity across Ying and Kuanping will reach approximately 1.5 million tonnes per year once safety permit updates are finalized. Construction of the new #3 mill is advancing with foundations completed for the machine shop, crushed ore silo, and main plant, while tailings thickener excavation is underway. The mill adds 3,000 tonnes per day of processing capacity and targets commissioning in fiscal 2028. This infrastructure positions Silvercorp to capture higher throughput from existing ore bodies without new discovery risk.

  • Chaarat Tulkubash Timeline

    Phase 1 construction at the Tulkubash project in Kyrgyzstan reached the ore body after advancing 1,880 meters of access road since May 2026. Over 100,000 cubic meters of pre-stripping were completed in Q2, and heap leach pad earthworks by CRCC19 are largely finished. ADR and crushing plant designs are finalized with equipment tenders underway, targeting construction start in spring 2027 and commissioning by October 2027. The defined schedule and contractor readiness reduce execution uncertainty for this new production stream.

  • Contractor Cost Stability

    New three-year mining contractor agreements at Ying's seven individual mines took effect from May through September, locking in rates after an 8% increase this cycle. This provides cost visibility through fiscal 2030 and removes annual renegotiation risk during the ramp-up of expanded operations. Fixed contractor pricing combined with normalized production rates should improve per-tonne cost absorption as volumes increase toward the 1.5 million tonne permitted capacity.

  • Balance Sheet Liquidity

    Silvercorp ended Q2 with $384 million in cash and equivalents, supplemented by $428 million in market value of associate investments. A subsequent 50% drawdown on the RMB-denominated facility added approximately $112 million. Management confirmed no further capital raises are anticipated beyond a nominal amount for the Hong Kong listing. This liquidity cushion fully funds El Domo, Chaarat, and Ying expansion concurrently without dilution.

▼ Bear case
  • GC Mine Suspension Duration

    The GC operation remains fully suspended with no mining during Q2, and management targets a November 2027 restart at the earliest. This requires regulatory approval of an updated mine design followed by 6 to 8 months of safety construction before a new permit can be obtained. In the interim, GC contributes zero revenue while the company evaluates strategic alternatives including a partial or complete sale. The extended timeline creates a sustained production gap that offsets Ying's recovery.

  • Ying Cash Cost Escalation

    Ying's cash cost per ounce of silver net of by-product credits surged to $2.73 from $0.97 year-over-year, driven by a 43% decline in silver sold, 6% RMB appreciation, and 22% lower byproduct credits. All-in sustaining cost per ounce reached $16.11, up 37%. Even with normalized production, the stronger RMB and reduced byproduct offsets create a structurally higher cost floor that compresses margins at current silver prices.

  • El Domo Rainfall Delays

    Construction at El Domo absorbed 620 millimeters of rainfall during Q2, stalling tailings storage facility work and limiting quality rock supply for the starter dam. Additional drainage and diversion systems beyond original design were required, increasing scope and cost. The heavy rainfall pattern during the supposed dry season suggests ongoing weather risk that could further defer the project schedule and streaming drawdowns tied to construction milestones.

  • Condor Licensing Uncertainty

    The Condor project in Ecuador remains in early permitting stages, with the FPIC process only authorized on October 9 and the PPC preliminary site visit still pending. License documentation cannot begin until both processes complete, expected in June 2027. Underground development at Camp and Los Cuyes deposits is entirely dependent on this timeline, deferring any resource definition or production contribution well beyond the current fiscal planning horizon.

  • Free Cash Flow Decline

    Free cash flow contracted to $5 million in Q2, down 41% year-over-year, as $51 million in combined capital expenditures across China, Ecuador, and Kyrgyzstan outpaced $63 million in operating cash flow. The streaming facility drawdowns mask the underlying cash burn from concurrent mega-project spending. Sustained negative free cash flow would erode the cash position unless project timelines accelerate or metal prices rise materially.

Products and services [axis] Breakdown of Revenue (2026)

History

Segments [axis] Breakdown of Revenue (2026)

History
Peer percentiles

How Silvercorp Metals ranks

Ranked against the 180 companies in Metals and Mining58 metrics · as of Nov 28, 2026

Valuation

12 metrics · Lower multiples rank higher; a negative multiple ranks last
  • P/E 38.5xMedian 11.4x 62nd
  • P/FCF 5.76xMedian 10.9x 91st
  • P/Operating cash flow 4.82xMedian 8.48x 94th
  • P/S 3.61xMedian 2.55x 39th
  • P/B 1.40xMedian 1.86x 63rd
  • P/Tangible book 1.40xMedian 1.96x 67th
  • EV/EBITDA 6.46xMedian 7.30x 71st
  • EV/EBIT 7.80xMedian 8.12x 74th
  • EV/Revenue 2.79xMedian 2.15x 43rd
  • EV/FCF 4.45xMedian 9.75x 95th
  • EV/Operating cash flow 3.72xMedian 8.65x 96th
  • PEG (3Y EPS CAGR)EPS is not growing −2.90Median 0.13 Not meaningful —
Peer group

Peer Comparison

Companies in the Silver
View all peers
S.No. Ticker Company Market CapP/EP/STotal Debt (Qtr)
1 SCCO Southern Copper Corp/ 124.11 Bn19.387.268.00 Bn
2 NEM NEWMONT Corp /DE/ 111.06 Bn12.134.175.09 Bn
3 AEM Agnico Eagle Mines Ltd 87.71 Bn14.215.831.32 Bn
4 FCX Freeport-Mcmoran Inc 72.85 Bn21.182.769.40 Bn
5 B Barrick Mining Corp 61.22 Bn9.532.844.70 Bn
6 NUE Nucor Corp 57.75 Bn16.161.497.09 Bn
7 MT ArcelorMittal 45.06 Bn43.160.7113.57 Bn
8 SVM Silvercorp Metals Inc 1.67 Bn38.523.610.00 Bn