ArcelorMittal is one of the world's leading integrated steel and mining companies. It produces a broad range of high-quality finished and semi-finished steel products including flat products such as sheet and plate, long products such as bars, rods and structural shapes, and pipes and tubes for various applications. ArcelorMittal's mining operations produce various types of mining products including iron ore lump, fines, concentrate, pellets and sinter feed. The company…
The new European tariff rate quota framework took effect on July 1, 2026, and third quarter imports of flat steel products fell approximately 50% year-on-year. With all European blast furnaces now running - Dąbrowa, Asturias, and Fos back in operation - the company is capturing the volume previously lost to imports. Because order books are lengthening and 25% of flat volumes remain on annual contracts yet to reset, the full pricing and volume benefit will compound through 2027 as inventory destocking ends and contract repricing accelerates.
Roughly 25% of European flat product volumes are tied to annual contracts, predominantly with automotive customers, and the significant majority follow the calendar year. Pricing guidelines for January 2027 are already significantly above current index levels, meaning a large block of revenue will step up at the start of the year without any volume risk. This contract roll provides a visible, mechanical uplift to average selling prices and EBITDA per ton in the first half of 2027.
The 6 million ton per year expansion at Hazira has commissioned its downstream cold mill and automotive finishing lines, is testing new coke oven batteries, and is making good progress on the upstream furnaces. Management expects the first incremental volumes to appear in the first half of 2027, with a more meaningful contribution in the second half. This brownfield growth adds high-margin automotive and value-added tonnage in a market where shipments through September already set a new record.
The Liberia mining project shipped 10.5 million tons in the first nine months of 2026 and targets 16 million tons for the full year, with the fourth quarter expected to run at the 20 million ton annualized capacity rate. Rail and port infrastructure already supports the full 20 million ton rate, and covering stockyards at the port will eliminate weather-related shipping interruptions. Higher volumes, a richer product mix, and lower unit costs as capacity fills will expand mining EBITDA and reduce the group's external iron ore purchases.
The electric arc furnace at Calvert is ramping more slowly than originally planned but is on track to exit 2026 at a strong run rate. Every ton produced locally displaces a ton of slab imported under the Section 232 tariff structure, directly expanding margins. With Canadian and Mexican pricing parity restored to pre-tariff norms and U.S. supply-demand tight, the furnace ramp provides a structural cost advantage that will be fully realized in 2027.
Energy prices in Europe continued to evolve upward through the third quarter, and the CFO acknowledged it is difficult to be specific on guidance for the next six weeks. Restarted blast furnaces carry higher carbon costs, and while fixed cost absorption improves with volume, the net margin per ton depends on whether steel prices can fully pass through persistently elevated gas and power costs. If energy remains sticky, the EBITDA per ton improvement seen in Q3 could compress in Q4 and early 2027.
Apparent steel consumption in Q3 was depressed because end-users drew down inventories rather than ordering new tons. Management expects destocking to largely end in Q4, but until it does, the 50% drop in imports does not fully translate into ArcelorMittal shipments. If destocking extends deeper into 2027 or is followed by weak real demand, the volume bridge from import substitution will be delayed and the restarted furnaces will operate below optimal utilization.
Management explicitly differentiated the Brazilian flat business, which benefits from anti-dumping duties on cold roll, galvanized, painted, and soon HRC from China, from the longs business where protection is "maybe not as much as we would like to see." Longs rely on EAF production exposed to high electricity costs and a depressed construction end market. Capital is being directed to flat downstream investments, leaving the longs franchise vulnerable to import pressure and margin erosion.
All Ukrainian facilities have halted production and are moving to cold idle. Inventories are being liquidated to fund near-term site costs, after which only a minimal security expenditure remains. While the CFO expects no significant European market impact because Ukrainian capacity was already heavily impaired and subject to TRQ quotas, the complete loss of a regional asset removes optional supply flexibility and any future recovery value if the geopolitical environment improves.
The Calvert EAF ramp-up is acknowledged to be moving "a little bit slower than what we were expecting." Until nameplate capacity is reached, the plant continues to import slabs under tariff-bearing contracts - now sourced from U.S. Steel after the Cliffs contract expired. Any further technical delays postpone the margin benefit of self-supplied metallics and keep the North American cost structure elevated relative to the full-potential run rate.
| S.No. | Ticker | Company | Market Cap | P/E | P/S | Total Debt (Qtr) |
|---|---|---|---|---|---|---|
| 1 | SCCO | Southern Copper Corp/ | 124.11 Bn | 19.38 | 7.26 | 8.00 Bn |
| 2 | NEM | NEWMONT Corp /DE/ | 111.06 Bn | 12.13 | 4.17 | 5.09 Bn |
| 3 | AEM | Agnico Eagle Mines Ltd | 87.71 Bn | 14.21 | 5.83 | 1.32 Bn |
| 4 | FCX | Freeport-Mcmoran Inc | 72.85 Bn | 21.18 | 2.76 | 9.40 Bn |
| 5 | B | Barrick Mining Corp | 61.22 Bn | 9.53 | 2.84 | 4.70 Bn |
| 6 | NUE | Nucor Corp | 57.75 Bn | 16.16 | 1.49 | 7.09 Bn |
| 7 | MT | ArcelorMittal | 45.06 Bn | 43.16 | 0.71 | 13.57 Bn |
| 8 | AU | AngloGold Ashanti PLC | 41.78 Bn | 10.64 | 3.47 | 1.59 Bn |