Agnico Eagle Mines AEM

NYSE AEM
$173.30 +12.12 (+7.52%)
At close: Nov 27, 2026 · 4:00 PM EST
Key Stats
Market Cap87.71 Bn
Enterprise Value85.41 Bn
Revenue (Yr)11.91 Bn
P/E14.21
P/FCF15.53
EV to EBIT9.71
Net Income (Yr)4.46 Bn
FCF (Yr)4.40 Bn
EPS (Diluted) (TTM)12.17
Revenue Growth (1y) (Yr)43.71%
Net Margin (Yr)157.04%
ROA (Yr)13.84%
Add ratio to table…

About

Agnico Eagle Mines Ltd is Canada’s largest mining company and the second largest gold producer in the world. It extracts precious metals from operating mines located in Canada, Australia, Finland and Mexico and maintains a pipeline of exploration and development projects. Founded in 1957, the company has declared a cash dividend every year since 1983 and pursues a strategy of high quality growth while upholding rigorous health, safety, environmental and social…

Read more ↓
Sector: Basic Materials Sector rationale The company's primary revenue is generated from the extraction and sale of gold, which is a precious metal sold to bullion banks and refiners. According to the sector definitions, gold and silver mining belong in Basic Materials. Industry: Gold Gold Primary The company is described as the second largest gold producer in the world and generates revenue primarily from the sale of gold produced at its mines. It sells this gold production to bullion banks, commodity traders, and refiners. Classified using BQ-MICS CIK: 0000002809
Bull & bear

Investment Thesis

▲ Bull case
  • Malartic Shaft Commissioning Accelerates

    The first production shaft at Malartic is on track for Q2 2027 start-up with over 70% of construction complete and the sinking phase finished four months ahead of schedule, unlocking access to the high-grade East Gouldie and Odyssey zones at depth. The new Blair production hoist, the largest in the world with a 20-foot drum and twin 12,000-horsepower motors, is now being installed to replace the sinking hoist. Surface infrastructure including a 300-person office complex, 1,200-basket changeroom, paste backfill plant, and modern core shack is already finished. Commissioning this shaft on time converts years of exploration success into cash flow without requiring a new mill, keeping incremental capital intensity low while adding long-life, high-margin ounces to the portfolio.

  • Hope Bay Construction Momentum Builds

    Hope Bay has transitioned from investment decision to disciplined execution, with detail engineering at 75% and overall construction at 13% by end of September 2026, marking the fourth mine Agnico Eagle has built in Nunavut. The project completed a critical sealift delivering 220,000 cubic meters of equipment - equivalent to 2,000 to 3,000 truckloads - on schedule through the Roberts Bay Jetty, while 25% of structural steel is already erected on the new 37-megawatt power plant and multi-service building. A first-of-its-kind-in-Canada blade lifting system was successfully used to install the initial 4.2-megawatt turbine blade, and the renewed IBA with the Kitikmeot Inuit Association secures the 80-kilometer belt through 2056, de-risking both construction and future exploration upside at Boston and Madrid Patch 7.

  • Detour Underground Development Internalized

    Detour Lake fully internalized the exploration ramp development contract this quarter with support from Macassa miners, achieving a quarterly record in development performance from two active headings advancing the ramp and cross-cut toward the Domain 54 mineralized zone. The bulk sample is expected by the first half of 2027, with data feeding directly into the mine plan to enable potential underground production as early as 2028, while overburden removal for the conveyor ramp portal and construction of camp expansion, water treatment, and multi-service building advance in parallel. Since 2020, the site has doubled mineral reserves and resources, increased mill throughput from 22 to 28 million tonnes annually, and is on track toward the 1 million ounce per year target by the early 2030s, with exploration still defining a potentially larger open pit, higher milling capacity, and expanded underground footprint.

  • Upper Beaver Shaft Advances Toward New Camp

    Upper Beaver's exploration ramp advanced over 600 meters this quarter to a depth of 210 meters, achieving a fifth consecutive quarterly development record, while shaft sinking reached just over 730 meters with the 760-level station excavation planned to commence this quarter. Following high-intensity drilling results, the company is evaluating extending the shaft to 1,200 meters to support infill drilling and potential resource growth at depth, laying the groundwork for a new mining camp in the Kirkland Lake district. Housing infrastructure is being developed with the municipality to support a workforce of roughly 700 people, and a targeted immigration program for heavy-duty mechanics and trades is already being trialed at Macassa and Detour to secure critical skilled labor for the project ramp-up.

  • Exploration Upside Extends Mine Lives

    Drilling across the portfolio continues to expand the resource base beyond current mine plans, with East Gouldie returning 2.8 grams per tonne over 34 meters at 1,950 meters depth - 100 meters below the current shaft and 100 meters west of the planned ultimate depth - while the Eclipse Zone delivered 3.8 grams over 36 meters and the Artemis Zone returned 9.5 grams over 18.9 meters at 1,000 meters depth, confirming lateral and sub-parallel extensions near planned infrastructure. At Detour, hole 1,367 returned 19 grams over 26 meters at 230 meters depth near the current reserve pit limit, and hole 1,405 intersected 11.9 grams over 5.4 meters at 580 meters in the saddle area, both supporting pit optimization and underground expansion. At Hope Bay, Madrid Patch 7 remains open at depth with 37 grams over 2.8 meters at nearly 700 meters, and the first Boston drilling in five years hit 11 grams over 12 meters and 17 grams over 4.5 meters at 200 meters, with a more aggressive 2027 program planned. In Finland, Ikkari's Helmi zone returned 15 grams over 10 meters uncapped (3.2 grams capped) with visible gold at depth, confirming the acquisition thesis and supporting a multi-year aggressive drill program across the belt.

▼ Bear case
  • Diesel Cost Inflation Compresses Margins

    Total cash costs rose to $1,133 per ounce in Q3 2026, 1% above the top end of guidance, with elevated diesel prices adding more than $30 per ounce versus budget and representing approximately 11% of operating costs. Management flagged a potential $50 to $60 per ounce impact in Q4 and up to $80 per ounce for the full year - a 7% year-over-year increase - while other consumables face additional inflationary pressure. Although grid power in Ontario and Quebec and a predominantly underground portfolio provide some insulation relative to open-pit peers, the company has no visibility on whether diesel remains at $100 per barrel or reverts lower, and hedging covers only a portion of exposure, leaving margins vulnerable to sustained energy inflation through 2027 and beyond.

  • U.S. Tariff Exposure Adds Cost Uncertainty

    A $5 per ounce cost impact from U.S. retaliatory tariffs was disclosed for Q4 2026, with management stating the impact would increase if a trade deal is not reached and carrying into 2027. While the absolute figure is modest relative to the $1,133 cash cost base, it introduces an exogenous policy variable that cannot be controlled operationally and compounds with diesel and consumable inflation to push all-in sustaining costs toward the upper end of the $1,400 to $1,550 guidance range, reducing the buffer for shareholder returns if gold prices moderate.

  • Labor Availability Constrains Project Execution

    Management acknowledged that while wage inflation is not yet material, the availability of high-quality labor - particularly tradespeople and heavy-duty mechanics - is the primary workforce challenge over the next decade, with exploration drillers acting as the early indicator. Housing shortages in the Kirkland Lake district for Upper Beaver's roughly 700-person workforce and at Hope Bay's 800-to-900-bed camp require municipal partnerships and capital to resolve, while a targeted immigration program is only in trial phase at Macassa and Detour. With four major projects advancing simultaneously - Detour Underground, Malartic shaft, Hope Bay, and Upper Beaver - plus potential Marban and Wasamac development, the cumulative skilled labor demand creates execution risk if recruitment and housing solutions lag behind construction schedules.

  • Capital Intensity Rises During Peak Spend Years

    Development capital of approximately $1.6 billion has been deployed year-to-date across the four key growth projects, with total 2026 capital spending expected north of $3 billion and likely to increase over the next few years as Hope Bay construction accelerates and Upper Beaver shaft deepening proceeds. The company upsized its credit facility and shelf prospectus to right-size liquidity for this peak spending period, and while operating cash flow at current gold prices covers the outlay, a meaningful decline in gold price would test the balance sheet's defensive positioning and could force a choice between slowing project timelines or reducing the 50-plus% free cash flow return target that management has signaled for 2026 and flagged as a reasonable threshold for 2027.

  • Meadowbank Grade Shortfall Highlights Model Risk

    Meadowbank's Q3 production was impacted by lower-than-expected grades and mill throughput localized to a specific area of the IVR pit where the geological model diverged from mine reality, requiring model updates and plan revisions. While the underground and Whale Tail pit were unaffected, the incident underscores the inherent risk in reserve reconciliation at mature open-pit operations and the potential for similar localized discrepancies to emerge at other sites, particularly as the portfolio shifts toward deeper, more complex underground mining at Malartic, Detour, and Upper Beaver where geological continuity at depth remains unproven at scale.

Segments [axis] Breakdown of Revenue (2025)

History

Geographical areas [axis] Breakdown of Revenue (2025)

History
Peer percentiles

How Agnico Eagle Mines ranks

Ranked against the 180 companies in Metals and Mining58 metrics · as of Nov 28, 2026

Valuation

12 metrics · Lower multiples rank higher; a negative multiple ranks last
  • P/E 14.2xMedian 11.4x 76th
  • P/FCF 15.5xMedian 10.9x 78th
  • P/Operating cash flow 11.9xMedian 8.48x 70th
  • P/S 5.83xMedian 2.55x 27th
  • P/B 2.96xMedian 1.86x 32nd
  • P/Tangible book 2.96xMedian 1.96x 33rd
  • EV/EBITDA 8.12xMedian 7.30x 62nd
  • EV/EBIT 9.71xMedian 8.12x 71st
  • EV/Revenue 5.68xMedian 2.15x 22nd
  • EV/FCF 15.1xMedian 9.75x 75th
  • EV/Operating cash flow 11.6xMedian 8.65x 70th
  • PEG (3Y EPS CAGR) 0.42Median 0.13 30th
Peer group

Peer Comparison

Companies in the Gold
View all peers
S.No. Ticker Company Market CapP/EP/STotal Debt (Qtr)
1 SCCO Southern Copper Corp/ 124.11 Bn19.387.268.00 Bn
2 NEM NEWMONT Corp /DE/ 111.06 Bn12.134.175.09 Bn
3 AEM Agnico Eagle Mines Ltd 87.71 Bn14.215.831.32 Bn
4 FCX Freeport-Mcmoran Inc 72.85 Bn21.182.769.40 Bn
5 B Barrick Mining Corp 61.22 Bn9.532.844.70 Bn
6 NUE Nucor Corp 57.75 Bn16.161.497.09 Bn
7 MT ArcelorMittal 45.06 Bn43.160.7113.57 Bn
8 AU AngloGold Ashanti PLC 41.78 Bn10.643.471.59 Bn