Zhengye Biotechnology Holding (ZYBT) Construction in Progress (2023 - 2024)
Zhengye Biotechnology Holding (ZYBT) has disclosed Construction in Progress for 2 consecutive years, with $1.4 million as the latest value for Q4 2024.
- Quarterly Construction in Progress rose 28.35% to $1.4 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $1.4 million through Dec 2024, up 28.35% year-over-year, with the annual reading at $1.3 million for FY2024, 23.97% up from the prior year.
- Construction in Progress for Q4 2024 was $1.4 million at Zhengye Biotechnology Holding, up from $1.1 million in the prior quarter.
- The five-year high for Construction in Progress was $1.4 million in Q4 2024, with the low at $1.1 million in Q4 2023.