Growth Metrics

Zoetis (ZTS) Construction in Progress (2016 - 2025)

Zoetis (ZTS) has disclosed Construction in Progress for 10 consecutive years, with $1.4 billion as the latest value for Q4 2024.

  • On a quarterly basis, Construction in Progress rose 24.7% to $1.4 billion in Q4 2024 year-over-year; TTM through Dec 2024 was $1.4 billion, a 24.7% increase, with the full-year FY2024 number at $1.4 billion, up 24.7% from a year prior.
  • Construction in Progress was $1.4 billion for Q4 2024 at Zoetis, up from $1.1 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.4 billion in Q4 2024 to a low of $673.0 million in Q4 2020.
  • A 5-year average of $933.4 million and a median of $814.0 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: increased 9.7% in 2022, then skyrocketed 33.29% in 2023.
  • Zoetis' Construction in Progress stood at $673.0 million in 2020, then increased by 10.25% to $742.0 million in 2021, then increased by 9.7% to $814.0 million in 2022, then surged by 33.29% to $1.1 billion in 2023, then grew by 24.7% to $1.4 billion in 2024.
  • Per Business Quant, the three most recent readings for ZTS's Construction in Progress are $1.4 billion (Q4 2024), $1.1 billion (Q4 2023), and $814.0 million (Q4 2022).