Growth Metrics

Zoetis (ZTS) Construction in Progress: 2012-2024

  • Zoetis' Construction in Progress rose 24.70% to $1.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.4 billion, marking a year-over-year increase of 24.70%. This contributed to the annual value of $1.4 billion for FY2024, which is 24.70% up from last year.
  • Zoetis' Construction in Progress amounted to $1.4 billion in Q4 2024, which was up 24.70% from $1.1 billion recorded in Q4 2023.
  • In the past 5 years, Zoetis' Construction in Progress registered a high of $1.4 billion during Q4 2024, and its lowest value of $673.0 million during Q4 2020.
  • Over the past 3 years, Zoetis' median Construction in Progress value was $1.1 billion (recorded in 2023), while the average stood at $1.1 billion.
  • Data for Zoetis' Construction in Progress shows a peak YoY soared of 33.29% (in 2023) over the last 5 years.
  • Quarterly analysis of 5 years shows Zoetis' Construction in Progress stood at $673.0 million in 2020, then increased by 10.25% to $742.0 million in 2021, then rose by 9.70% to $814.0 million in 2022, then soared by 33.29% to $1.1 billion in 2023, then grew by 24.70% to $1.4 billion in 2024.
  • Its Construction in Progress was $1.4 billion in Q4 2024, compared to $1.1 billion in Q4 2023 and $814.0 million in Q4 2022.