Zoetis (ZTS) Construction in Progress (2016 - 2025)
Zoetis (ZTS) has disclosed Construction in Progress for 14 consecutive years, with $1.3 billion as the latest value for Q4 2025.
- Quarterly Construction in Progress fell 4.29% to $1.3 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.3 billion through Dec 2025, down 4.29% year-over-year, with the annual reading at $1.3 billion for FY2025, 4.29% down from the prior year.
- Construction in Progress for Q4 2025 was $1.3 billion at Zoetis, down from $1.4 billion in the prior quarter.
- The five-year high for Construction in Progress was $1.4 billion in Q4 2024, with the low at $742.0 million in Q4 2021.
- Average Construction in Progress over 5 years is $1.1 billion, with a median of $1.1 billion recorded in 2023.
- The sharpest move saw Construction in Progress surged 33.29% in 2023, then dropped 4.29% in 2025.
- Over 5 years, Construction in Progress stood at $742.0 million in 2021, then rose by 9.7% to $814.0 million in 2022, then soared by 33.29% to $1.1 billion in 2023, then increased by 24.7% to $1.4 billion in 2024, then dropped by 4.29% to $1.3 billion in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $1.3 billion, $1.4 billion, and $1.1 billion for Q4 2025, Q4 2024, and Q4 2023 respectively.