Growth Metrics

Zoetis (ZTS) Construction in Progress: 2012-2024

  • Zoetis' Construction in Progress rose 24.70% to $1.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.4 billion, marking a year-over-year increase of 24.70%. This contributed to the annual value of $1.4 billion for FY2024, which is 24.70% up from last year.
  • Per Zoetis' latest filing, its Construction in Progress stood at $1.4 billion for Q4 2024, which was up 24.70% from $1.1 billion recorded in Q4 2023.
  • Over the past 5 years, Zoetis' Construction in Progress peaked at $1.4 billion during Q4 2024, and registered a low of $673.0 million during Q4 2020.
  • For the 3-year period, Zoetis' Construction in Progress averaged around $1.1 billion, with its median value being $1.1 billion (2023).
  • Data for Zoetis' Construction in Progress shows a peak YoY surged of 33.29% (in 2023) over the last 5 years.
  • Zoetis' Construction in Progress (Quarterly) stood at $673.0 million in 2020, then climbed by 10.25% to $742.0 million in 2021, then increased by 9.70% to $814.0 million in 2022, then skyrocketed by 33.29% to $1.1 billion in 2023, then grew by 24.70% to $1.4 billion in 2024.
  • Its Construction in Progress was $1.4 billion in Q4 2024, compared to $1.1 billion in Q4 2023 and $814.0 million in Q4 2022.