Zoetis (ZTS) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Zoetis (ZTS) over the last 14 years, with Q4 2025 value amounting to $1.3 billion.
- Zoetis' Construction in Progress fell 428.68% to $1.3 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $1.3 billion, marking a year-over-year decrease of 428.68%. This contributed to the annual value of $1.3 billion for FY2025, which is 428.68% down from last year.
- As of Q4 2025, Zoetis' Construction in Progress stood at $1.3 billion, which was down 428.68% from $1.4 billion recorded in Q4 2024.
- In the past 5 years, Zoetis' Construction in Progress ranged from a high of $1.4 billion in Q4 2024 and a low of $742.0 million during Q4 2021
- For the 5-year period, Zoetis' Construction in Progress averaged around $1.1 billion, with its median value being $1.1 billion (2023).
- In the last 5 years, Zoetis' Construction in Progress skyrocketed by 3329.24% in 2023 and then plummeted by 428.68% in 2025.
- Over the past 5 years, Zoetis' Construction in Progress (Quarter) stood at $742.0 million in 2021, then rose by 9.7% to $814.0 million in 2022, then skyrocketed by 33.29% to $1.1 billion in 2023, then increased by 24.7% to $1.4 billion in 2024, then dropped by 4.29% to $1.3 billion in 2025.
- Its Construction in Progress stands at $1.3 billion for Q4 2025, versus $1.4 billion for Q4 2024 and $1.1 billion for Q4 2023.