Growth Metrics

Zoetis (ZTS) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Zoetis (ZTS) over the last 13 years, with Q4 2024 value amounting to $1.4 billion.

  • Zoetis' Construction in Progress rose 2470.05% to $1.4 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.4 billion, marking a year-over-year increase of 2470.05%. This contributed to the annual value of $1.4 billion for FY2024, which is 2470.05% up from last year.
  • According to the latest figures from Q4 2024, Zoetis' Construction in Progress is $1.4 billion, which was up 2470.05% from $1.1 billion recorded in Q4 2023.
  • In the past 5 years, Zoetis' Construction in Progress ranged from a high of $1.4 billion in Q4 2024 and a low of $673.0 million during Q4 2020
  • For the 5-year period, Zoetis' Construction in Progress averaged around $933.4 million, with its median value being $814.0 million (2022).
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 970.35% in 2022, then surged by 3329.24% in 2023.
  • Quarter analysis of 5 years shows Zoetis' Construction in Progress stood at $673.0 million in 2020, then rose by 10.25% to $742.0 million in 2021, then grew by 9.7% to $814.0 million in 2022, then surged by 33.29% to $1.1 billion in 2023, then rose by 24.7% to $1.4 billion in 2024.
  • Its Construction in Progress stands at $1.4 billion for Q4 2024, versus $1.1 billion for Q4 2023 and $814.0 million for Q4 2022.