Growth Metrics

Zoetis (ZTS) Construction in Progress (2016 - 2025)

Zoetis has reported Construction in Progress over the past 14 years, most recently at $1.3 billion for Q4 2025.

  • Quarterly Construction in Progress fell 4.29% to $1.3 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.3 billion through Dec 2025, down 4.29% year-over-year, with the annual reading at $1.3 billion for FY2025, 4.29% down from the prior year.
  • Construction in Progress was $1.3 billion for Q4 2025 at Zoetis, down from $1.4 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.4 billion in Q4 2024 and troughed at $742.0 million in Q4 2021.
  • The 5-year median for Construction in Progress is $1.1 billion (2023), against an average of $1.1 billion.
  • Year-over-year, Construction in Progress skyrocketed 33.29% in 2023 and then fell 4.29% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $742.0 million in 2021, then grew by 9.7% to $814.0 million in 2022, then skyrocketed by 33.29% to $1.1 billion in 2023, then rose by 24.7% to $1.4 billion in 2024, then decreased by 4.29% to $1.3 billion in 2025.
  • Per Business Quant, the three most recent readings for ZTS's Construction in Progress are $1.3 billion (Q4 2025), $1.4 billion (Q4 2024), and $1.1 billion (Q4 2023).