Cash Flow Statement
Growth Metrics

Xwell (XWEL) Construction in Progress (2017 - 2019)

Xwell's Construction in Progress history spans 3 years, with the latest figure at $719000.0 for Q1 2019.

  • On a quarterly basis, Construction in Progress changed N/A to $719000.0 in Q1 2019 year-over-year; TTM through Mar 2019 was $719000.0, a N/A change, with the full-year FY2018 number at $770000.0, down 10.47% from a year prior.
  • Construction in Progress hit $719000.0 in Q1 2019 for Xwell, down from $770000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for XWEL hit a ceiling of $860000.0 in Q4 2017 and a floor of $719000.0 in Q1 2019.
  • Historically, Construction in Progress has averaged $783000.0 across 3 years, with a median of $770000.0 in 2018.
  • The widest YoY moves for Construction in Progress: up 10.47% in 2018, down 10.47% in 2018.
  • Tracing XWEL's Construction in Progress over 3 years: stood at $860000.0 in 2017, then dropped by 10.47% to $770000.0 in 2018, then decreased by 6.62% to $719000.0 in 2019.
  • Business Quant data shows Construction in Progress for XWEL at $719000.0 in Q1 2019, $770000.0 in Q4 2018, and $860000.0 in Q4 2017.