KPIs & Operating Metrics(New)

W. P. Carey (WPC) Construction in Progress (2018 - 2021)

W. P. Carey (WPC) has disclosed Construction in Progress for 4 consecutive years, with $82.8 million as the latest value for Q1 2021.

  • On a quarterly basis, Construction in Progress fell 23.35% to $82.8 million in Q1 2021 year-over-year; TTM through Mar 2021 was $82.8 million, a 23.35% decrease, with the full-year FY2020 number at $119.4 million, up 71.53% from a year prior.
  • Construction in Progress was $82.8 million for Q1 2021 at W. P. Carey, down from $119.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $119.4 million in Q4 2020 to a low of $28.8 million in Q1 2019.
  • A 4-year average of $77.0 million and a median of $76.2 million in 2019 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 274.92% in 2020, then dropped 23.35% in 2021.
  • W. P. Carey's Construction in Progress stood at $63.1 million in 2018, then increased by 10.28% to $69.6 million in 2019, then soared by 71.53% to $119.4 million in 2020, then tumbled by 30.68% to $82.8 million in 2021.
  • Per Business Quant, the three most recent readings for WPC's Construction in Progress are $82.8 million (Q1 2021), $119.4 million (Q4 2020), and $94.8 million (Q3 2020).