Growth Metrics

Westlake Chemical Partners (WLKP) Construction in Progress (2016 - 2025)

Westlake Chemical Partners' Construction in Progress history spans 13 years, with the latest figure at $16.2 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 69.73% year-over-year to $16.2 million; the TTM value through Dec 2025 reached $16.2 million, down 69.73%, while the annual FY2025 figure was $16.2 million, 69.73% down from the prior year.
  • Construction in Progress reached $16.2 million in Q4 2025 per WLKP's latest filing, down from $53.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $53.6 million in Q4 2024 to a low of $16.2 million in Q4 2025.
  • Average Construction in Progress over 5 years is $32.9 million, with a median of $30.8 million recorded in 2021.
  • Peak YoY movement for Construction in Progress: soared 44.96% in 2023, then tumbled 69.73% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $30.8 million in 2021, then dropped by 15.33% to $26.0 million in 2022, then surged by 44.96% to $37.7 million in 2023, then surged by 42.01% to $53.6 million in 2024, then tumbled by 69.73% to $16.2 million in 2025.
  • Per Business Quant, the three most recent readings for WLKP's Construction in Progress are $16.2 million (Q4 2025), $53.6 million (Q4 2024), and $37.7 million (Q4 2023).