Westlake Chemical Partners (WLKP) Construction in Progress (2016 - 2025)
Westlake Chemical Partners filings provide 13 years of Construction in Progress readings, the most recent being $16.2 million for Q4 2025.
- On a quarterly basis, Construction in Progress fell 69.73% to $16.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $16.2 million, a 69.73% decrease, with the full-year FY2025 number at $16.2 million, down 69.73% from a year prior.
- Construction in Progress hit $16.2 million in Q4 2025 for Westlake Chemical Partners, down from $53.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $53.6 million in Q4 2024 to a low of $16.2 million in Q4 2025.
- Median Construction in Progress over the past 5 years was $30.8 million (2021), compared with a mean of $32.9 million.
- Biggest five-year swings in Construction in Progress: skyrocketed 44.96% in 2023 and later crashed 69.73% in 2025.
- Westlake Chemical Partners' Construction in Progress stood at $30.8 million in 2021, then dropped by 15.33% to $26.0 million in 2022, then surged by 44.96% to $37.7 million in 2023, then surged by 42.01% to $53.6 million in 2024, then tumbled by 69.73% to $16.2 million in 2025.
- The last three reported values for Construction in Progress were $16.2 million (Q4 2025), $53.6 million (Q4 2024), and $37.7 million (Q4 2023) per Business Quant data.