Sherwin Williams (SHW) Construction in Progress (2016 - 2019)
Historic Construction in Progress for Sherwin Williams (SHW) over the last 11 years, with Q4 2019 value amounting to $144.0 million.
- Sherwin Williams' Construction in Progress fell 263.69% to $144.0 million in Q4 2019 from the same period last year, while for Dec 2019 it was $144.0 million, marking a year-over-year decrease of 263.69%. This contributed to the annual value of $144.0 million for FY2019, which is 263.69% down from last year.
- Per Sherwin Williams' latest filing, its Construction in Progress stood at $144.0 million for Q4 2019, which was down 263.69% from $179.5 million recorded in Q3 2019.
- Sherwin Williams' 5-year Construction in Progress high stood at $179.5 million for Q3 2019, and its period low was $63.4 million during Q1 2015.
- For the 5-year period, Sherwin Williams' Construction in Progress averaged around $122.9 million, with its median value being $135.6 million (2017).
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 2108.66% in 2017, then surged by 14178.86% in 2018.
- Quarter analysis of 5 years shows Sherwin Williams' Construction in Progress stood at $81.1 million in 2015, then surged by 44.45% to $117.1 million in 2016, then skyrocketed by 51.12% to $177.0 million in 2017, then decreased by 16.44% to $147.9 million in 2018, then fell by 2.64% to $144.0 million in 2019.
- Its Construction in Progress stands at $144.0 million for Q4 2019, versus $179.5 million for Q3 2019 and $136.6 million for Q2 2019.