Ati (ATI) Construction in Progress (2016 - 2025)
Ati's Construction in Progress history spans 17 years, with the latest figure at $359.4 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 36.91% year-over-year to $359.4 million; the TTM value through Dec 2025 reached $359.4 million, up 36.91%, while the annual FY2025 figure was $359.4 million, 36.91% up from the prior year.
- Construction in Progress for Q4 2025 was $359.4 million at Ati, up from $295.1 million in the prior quarter.
- Across five years, Construction in Progress topped out at $359.4 million in Q4 2025 and bottomed at $211.4 million in Q3 2022.
- The 5-year median for Construction in Progress is $259.9 million (2024), against an average of $262.1 million.
- The largest YoY upside for Construction in Progress was 36.91% in 2025 against a maximum downside of 34.95% in 2025.
- A 5-year view of Construction in Progress shows it stood at $215.3 million in 2021, then dropped by 1.81% to $211.4 million in 2022, then surged by 44.7% to $305.9 million in 2023, then dropped by 14.19% to $262.5 million in 2024, then skyrocketed by 36.91% to $359.4 million in 2025.
- Per Business Quant, the three most recent readings for ATI's Construction in Progress are $359.4 million (Q4 2025), $295.1 million (Q3 2025), and $260.0 million (Q2 2025).