Westlake (WLK) Construction in Progress (2016 - 2023)
Historic Construction in Progress for Westlake (WLK) over the last 14 years, with Q4 2023 value amounting to $930.0 million.
- Westlake's Construction in Progress rose 1355.31% to $930.0 million in Q4 2023 from the same period last year, while for Dec 2023 it was $930.0 million, marking a year-over-year increase of 1355.31%. This contributed to the annual value of $930.0 million for FY2023, which is 1355.31% up from last year.
- According to the latest figures from Q4 2023, Westlake's Construction in Progress is $930.0 million, which was up 1355.31% from $819.0 million recorded in Q4 2022.
- In the past 5 years, Westlake's Construction in Progress ranged from a high of $930.0 million in Q4 2023 and a low of $527.0 million during Q4 2020
- For the 5-year period, Westlake's Construction in Progress averaged around $696.2 million, with its median value being $654.0 million (2021).
- As far as peak fluctuations go, Westlake's Construction in Progress plummeted by 435.57% in 2020, and later surged by 2522.94% in 2022.
- Quarter analysis of 5 years shows Westlake's Construction in Progress stood at $551.0 million in 2019, then dropped by 4.36% to $527.0 million in 2020, then grew by 24.1% to $654.0 million in 2021, then increased by 25.23% to $819.0 million in 2022, then increased by 13.55% to $930.0 million in 2023.
- Its last three reported values are $930.0 million in Q4 2023, $819.0 million for Q4 2022, and $654.0 million during Q4 2021.