Universe Pharmaceuticals (UPC) Construction in Progress: 2021-2024

  • Universe Pharmaceuticals' Construction in Progress fell 100.39% to -$37,467 in Q1 2024 from the same period last year, while for Mar 2024 it was -$37,467, marking a year-over-year decrease of 100.39%. This contributed to the annual value of $9.1 million for FY2023, which is 2.50% down from last year.
  • Universe Pharmaceuticals' Construction in Progress amounted to -$37,467 in Q1 2024, which was down 100.41% from $9.1 million recorded in Q3 2023.
  • Universe Pharmaceuticals' Construction in Progress' 5-year high stood at $10.7 million during Q3 2021, with a 5-year trough of -$37,467 in Q1 2024.
  • Over the past 3 years, Universe Pharmaceuticals' median Construction in Progress value was $9.1 million (recorded in 2023), while the average stood at $5.7 million.
  • Per our database at Business Quant, Universe Pharmaceuticals' Construction in Progress surged by 2,054.65% in 2023 and then plummeted by 100.39% in 2024.
  • Over the past 4 years, Universe Pharmaceuticals' Construction in Progress (Quarterly) stood at $10.7 million in 2021, then fell by 12.94% to $9.3 million in 2022, then dropped by 2.50% to $9.1 million in 2023, then plummeted by 100.39% to -$37,467 in 2024.
  • Its Construction in Progress was -$37,467 in Q1 2024, compared to $9.1 million in Q3 2023 and $9.7 million in Q1 2023.