Umh Properties (UMH) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Umh Properties (UMH) over the last 16 years, with Q3 2025 value amounting to $76.4 million.
- Umh Properties' Construction in Progress rose 1577.65% to $76.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $76.4 million, marking a year-over-year increase of 1577.65%. This contributed to the annual value of $33.9 million for FY2024, which is 169.96% up from last year.
- Umh Properties' Construction in Progress amounted to $76.4 million in Q3 2025, which was up 1577.65% from $62.1 million recorded in Q2 2025.
- Umh Properties' Construction in Progress' 5-year high stood at $76.4 million during Q3 2025, with a 5-year trough of $22.4 million in Q4 2021.
- For the 5-year period, Umh Properties' Construction in Progress averaged around $39.9 million, with its median value being $35.8 million (2023).
- In the last 5 years, Umh Properties' Construction in Progress surged by 5386.48% in 2021 and then soared by 169.96% in 2024.
- Umh Properties' Construction in Progress (Quarter) stood at $22.4 million in 2021, then increased by 4.02% to $23.2 million in 2022, then soared by 43.23% to $33.3 million in 2023, then increased by 1.7% to $33.9 million in 2024, then soared by 125.5% to $76.4 million in 2025.
- Its Construction in Progress stands at $76.4 million for Q3 2025, versus $62.1 million for Q2 2025 and $45.8 million for Q1 2025.