Udr (UDR) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Udr (UDR) over the last 17 years, with Q4 2025 value amounting to $72.9 million.
- Udr's Construction in Progress changed N/A to $72.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $72.9 million, marking a year-over-year change of. This contributed to the annual value of $72.9 million for FY2025, which is N/A changed from last year.
- As of Q4 2025, Udr's Construction in Progress stood at $72.9 million.
- In the past 5 years, Udr's Construction in Progress ranged from a high of $457.2 million in Q1 2022 and a low of $33.5 million during Q1 2025
- Moreover, its 5-year median value for Construction in Progress was $160.2 million (2023), whereas its average is $204.2 million.
- Its Construction in Progress has fluctuated over the past 5 years, first soared by 15500.66% in 2021, then tumbled by 8327.61% in 2023.
- Over the past 5 years, Udr's Construction in Progress (Quarter) stood at $388.1 million in 2021, then crashed by 51.09% to $189.8 million in 2022, then dropped by 15.59% to $160.2 million in 2023, then fell by 21.27% to $126.1 million in 2024, then tumbled by 42.22% to $72.9 million in 2025.
- Its last three reported values are $72.9 million in Q4 2025, $52.7 million for Q3 2025, and $41.1 million during Q2 2025.