Growth Metrics

Ultra Clean Holdings (UCTT) Construction in Progress (2016 - 2026)

Ultra Clean Holdings filings provide 11 years of Construction in Progress readings, the most recent being $24.0 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 46.07% to $24.0 million in Q1 2026 year-over-year; TTM through Mar 2026 was $24.0 million, a 46.07% decrease, with the full-year FY2025 number at $22.4 million, down 40.9% from a year prior.
  • Construction in Progress hit $24.0 million in Q1 2026 for Ultra Clean Holdings, up from $22.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $73.2 million in Q3 2023 to a low of $22.4 million in Q4 2025.
  • Median Construction in Progress over the past 5 years was $40.8 million (2022), compared with a mean of $43.4 million.
  • Biggest five-year swings in Construction in Progress: surged 63.03% in 2023 and later plummeted 57.08% in 2024.
  • Ultra Clean Holdings' Construction in Progress stood at $56.8 million in 2022, then dropped by 28.7% to $40.5 million in 2023, then dropped by 6.42% to $37.9 million in 2024, then plummeted by 40.9% to $22.4 million in 2025, then grew by 7.14% to $24.0 million in 2026.
  • The last three reported values for Construction in Progress were $24.0 million (Q1 2026), $22.4 million (Q4 2025), and $29.5 million (Q3 2025) per Business Quant data.