Terreno Realty (TRNO) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Terreno Realty (TRNO) over the last 10 years, with Q4 2025 value amounting to $217.4 million.

  • Terreno Realty's Construction in Progress fell 104.57% to $217.4 million in Q4 2025 from the same period last year, while for Dec 2025 it was $217.4 million, marking a year-over-year decrease of 104.57%. This contributed to the annual value of $217.4 million for FY2025, which is 104.57% down from last year.
  • Terreno Realty's Construction in Progress amounted to $217.4 million in Q4 2025, which was down 104.57% from $220.4 million recorded in Q3 2025.
  • Terreno Realty's 5-year Construction in Progress high stood at $399.5 million for Q1 2024, and its period low was $44.3 million during Q3 2022.
  • Its 5-year average for Construction in Progress is $195.7 million, with a median of $218.5 million in 2024.
  • As far as peak fluctuations go, Terreno Realty's Construction in Progress crashed by 5565.74% in 2022, and later surged by 66574.91% in 2023.
  • Terreno Realty's Construction in Progress (Quarter) stood at $65.2 million in 2021, then decreased by 20.35% to $51.9 million in 2022, then surged by 561.87% to $343.5 million in 2023, then tumbled by 36.05% to $219.7 million in 2024, then decreased by 1.05% to $217.4 million in 2025.
  • Its Construction in Progress stands at $217.4 million for Q4 2025, versus $220.4 million for Q3 2025 and $247.5 million for Q2 2025.