KPIs & Operating Metrics(New)
Growth Metrics

Trimble (TRMB) Construction in Progress: 2011-2016

Historic Construction in Progress for Trimble (TRMB) over the last 5 years, with Jan 2016 value amounting to $13.5 million.

  • Trimble's Construction in Progress fell 45.34% to $13.5 million in Q1 2016 from the same period last year, while for Jan 2016 it was $13.5 million, marking a year-over-year decrease of 45.34%. This contributed to the annual value of $13.5 million for FY2016, which is 45.34% down from last year.
  • According to the latest figures from FY2016, Trimble's Construction in Progress is $13.5 million, which was down 45.34% from $24.7 million recorded in FY2015.
  • Trimble's Construction in Progress' 5-year high stood at $36.5 million during FY2012, with a 5-year trough of $13.5 million in FY2016.
  • Over the past 3 years, Trimble's median Construction in Progress value was $24.7 million (recorded in 2015), while the average stood at $22.5 million.
  • As far as peak fluctuations go, Trimble's Construction in Progress spiked by 337.11% in 2012, and later crashed by 45.34% in 2016.
  • Yearly analysis of 4 years shows Trimble's Construction in Progress stood at $36.5 million in 2012, then fell by 19.84% to $29.2 million in 2014, then decreased by 15.47% to $24.7 million in 2015, then plummeted by 45.34% to $13.5 million in 2016.