KPIs & Operating Metrics(New)
Growth Metrics

Trimble (TRMB) Construction in Progress: 2011-2016

  • Trimble's Construction in Progress fell 45.34% to $13.5 million in Q1 2016 from the same period last year, while for Jan 2016 it was $13.5 million, marking a year-over-year decrease of 45.34%. This contributed to the annual value of $13.5 million for FY2016, which is 45.34% down from last year.
  • Per Trimble's latest filing, its Construction in Progress stood at $13.5 million for Q1 2016, which was down 45.34% from $24.7 million recorded in Q1 2015.
  • Trimble's 5-year Construction in Progress high stood at $36.5 million for Q4 2012, and its period low was $13.5 million during Q1 2016.
  • For the 3-year period, Trimble's Construction in Progress averaged around $22.5 million, with its median value being $24.7 million (2015).
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 337.11% in 2012, then crashed by 45.34% in 2016.
  • Trimble's Construction in Progress (Quarterly) stood at $36.5 million in 2012, then decreased by 19.84% to $29.2 million in 2014, then fell by 15.47% to $24.7 million in 2015, then slumped by 45.34% to $13.5 million in 2016.
  • Its Construction in Progress was $13.5 million in Q1 2016, compared to $24.7 million in Q1 2015 and $29.2 million in Q1 2014.