Trico Bancshares (TCBK) Construction in Progress: 2016-2018
Historic Construction in Progress for Trico Bancshares (TCBK) over the last 3 years, with Dec 2018 value amounting to $701,000.
- Trico Bancshares' Construction in Progress fell 67.36% to $701,000 in Q4 2018 from the same period last year, while for Dec 2018 it was $701,000, marking a year-over-year decrease of 67.36%. This contributed to the annual value of $701,000 for FY2018, which is 67.36% down from last year.
- Trico Bancshares' Construction in Progress amounted to $701,000 in Q4 2018, which was down 26.67% from $956,000 recorded in Q3 2018.
- Trico Bancshares' Construction in Progress' 5-year high stood at $6.5 million during Q3 2017, with a 5-year trough of $149,000 in Q1 2016.
- In the last 3 years, Trico Bancshares' Construction in Progress had a median value of $1.9 million in 2017 and averaged $1.9 million.
- Its Construction in Progress has fluctuated over the past 5 years, first spiked by 1,750.29% in 2017, then slumped by 85.24% in 2018.
- Over the past 3 years, Trico Bancshares' Construction in Progress (Quarterly) stood at $2.5 million in 2016, then declined by 14.86% to $2.1 million in 2017, then tumbled by 67.36% to $701,000 in 2018.
- Its Construction in Progress was $701,000 in Q4 2018, compared to $956,000 in Q3 2018 and $1.9 million in Q2 2018.