KPIs & Operating Metrics(New)

Trico Bancshares (TCBK) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Trico Bancshares (TCBK) over the last 3 years, with Q4 2018 value amounting to $701000.0.

  • Trico Bancshares' Construction in Progress fell 6736.5% to $701000.0 in Q4 2018 from the same period last year, while for Dec 2018 it was $701000.0, marking a year-over-year decrease of 6736.5%. This contributed to the annual value of $701000.0 for FY2018, which is 6736.5% down from last year.
  • Latest data reveals that Trico Bancshares reported Construction in Progress of $701000.0 as of Q4 2018, which was down 6736.5% from $956000.0 recorded in Q3 2018.
  • In the past 5 years, Trico Bancshares' Construction in Progress registered a high of $6.5 million during Q3 2017, and its lowest value of $149000.0 during Q1 2016.
  • Its 3-year average for Construction in Progress is $1.9 million, with a median of $1.9 million in 2017.
  • Per our database at Business Quant, Trico Bancshares' Construction in Progress surged by 175028.57% in 2017 and then plummeted by 8523.78% in 2018.
  • Over the past 3 years, Trico Bancshares' Construction in Progress (Quarter) stood at $2.5 million in 2016, then dropped by 14.86% to $2.1 million in 2017, then tumbled by 67.36% to $701000.0 in 2018.
  • Its last three reported values are $701000.0 in Q4 2018, $956000.0 for Q3 2018, and $1.9 million during Q2 2018.