KPIs & Operating Metrics(New)

Trico Bancshares (TCBK) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Trico Bancshares (TCBK) over the last 3 years, with Q4 2018 value amounting to $701000.0.

  • Trico Bancshares' Construction in Progress fell 6736.5% to $701000.0 in Q4 2018 from the same period last year, while for Dec 2018 it was $701000.0, marking a year-over-year decrease of 6736.5%. This contributed to the annual value of $701000.0 for FY2018, which is 6736.5% down from last year.
  • As of Q4 2018, Trico Bancshares' Construction in Progress stood at $701000.0, which was down 6736.5% from $956000.0 recorded in Q3 2018.
  • In the past 5 years, Trico Bancshares' Construction in Progress ranged from a high of $6.5 million in Q3 2017 and a low of $149000.0 during Q1 2016
  • In the last 3 years, Trico Bancshares' Construction in Progress had a median value of $1.9 million in 2017 and averaged $1.9 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 175028.57% in 2017, then crashed by 8523.78% in 2018.
  • Quarter analysis of 3 years shows Trico Bancshares' Construction in Progress stood at $2.5 million in 2016, then fell by 14.86% to $2.1 million in 2017, then plummeted by 67.36% to $701000.0 in 2018.
  • Its Construction in Progress was $701000.0 in Q4 2018, compared to $956000.0 in Q3 2018 and $1.9 million in Q2 2018.