Tantech Holdings (TANH) Construction in Progress (2016)
Historic Construction in Progress for Tantech Holdings (TANH) over the last 3 years, with Q2 2016 value amounting to $221794.0.
- Tantech Holdings' Construction in Progress changed N/A to $221794.0 in Q2 2016 from the same period last year, while for Jun 2016 it was $221794.0, marking a year-over-year change of. This contributed to the annual value of $227094.0 for FY2015, which is 1900.95% down from last year.
- Per Tantech Holdings' latest filing, its Construction in Progress stood at $221794.0 for Q2 2016.
- Tantech Holdings' 5-year Construction in Progress high stood at $280396.0 for Q4 2014, and its period low was $221794.0 during Q2 2016.
- In the last 3 years, Tantech Holdings' Construction in Progress had a median value of $227094.0 in 2015 and averaged $243094.7.
- Within the past 5 years, the most significant YoY rise in Tantech Holdings' Construction in Progress was 1900.95% (2015), while the steepest drop was 1900.95% (2015).
- Over the past 3 years, Tantech Holdings' Construction in Progress (Quarter) stood at $280396.0 in 2014, then decreased by 19.01% to $227094.0 in 2015, then decreased by 2.33% to $221794.0 in 2016.
- Its Construction in Progress stands at $221794.0 for Q2 2016, versus $227094.0 for Q4 2015 and $280396.0 for Q4 2014.