Sensient Technologies (SXT) Construction in Progress (2016 - 2026)
Sensient Technologies (SXT) has disclosed Construction in Progress for 17 consecutive years, with $78.5 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 78.68% to $78.5 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $78.5 million through Dec 2025, up 78.68% year-over-year, with the annual reading at $78.5 million for FY2025, 78.68% up from the prior year.
- Construction in Progress for Q4 2025 was $78.5 million at Sensient Technologies, up from $70.6 million in the prior quarter.
- The five-year high for Construction in Progress was $78.5 million in Q4 2025, with the low at $28.8 million in Q2 2021.
- Average Construction in Progress over 5 years is $51.3 million, with a median of $49.4 million recorded in 2022.
- The sharpest move saw Construction in Progress skyrocketed 100.63% in 2022, then tumbled 47.03% in 2024.
- Over 5 years, Construction in Progress stood at $32.8 million in 2021, then skyrocketed by 100.63% to $65.8 million in 2022, then dropped by 10.21% to $59.1 million in 2023, then decreased by 25.66% to $43.9 million in 2024, then surged by 78.68% to $78.5 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $78.5 million, $70.6 million, and $62.9 million for Q4 2025, Q3 2025, and Q2 2025 respectively.