Suncor Energy (SU) Construction in Progress (2016 - 2025)

Suncor Energy has reported Construction in Progress over the past 10 years, most recently at $4.0 billion for Q4 2025.

  • For Q4 2025, Construction in Progress fell 17.5% year-over-year to $4.0 billion; the TTM value through Dec 2025 reached $4.0 billion, down 17.5%, while the annual FY2025 figure was $4.0 billion, 19.3% down from the prior year.
  • Construction in Progress for Q4 2025 was $4.0 billion at Suncor Energy, down from $4.9 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $5.8 billion in Q4 2023 and troughed at $3.6 billion in Q4 2021.
  • A 5-year average of $4.6 billion and a median of $4.6 billion in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: increased 27.18% in 2022 and later dropped 17.5% in 2025.
  • Year by year, Construction in Progress stood at $3.6 billion in 2021, then increased by 27.18% to $4.6 billion in 2022, then grew by 25.03% to $5.8 billion in 2023, then decreased by 16.11% to $4.9 billion in 2024, then dropped by 17.5% to $4.0 billion in 2025.
  • Business Quant data shows Construction in Progress for SU at $4.0 billion in Q4 2025, $4.9 billion in Q4 2024, and $5.8 billion in Q4 2023.