Suncor Energy (SU) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Suncor Energy (SU) over the last 9 years, with Q4 2024 value amounting to $5.6 billion.

  • Suncor Energy's Construction in Progress fell 377.76% to $5.6 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $5.6 billion, marking a year-over-year decrease of 377.76%. This contributed to the annual value of $5.7 billion for FY2024, which is 270.01% down from last year.
  • According to the latest figures from Q4 2024, Suncor Energy's Construction in Progress is $5.6 billion, which was down 377.76% from $5.8 billion recorded in Q4 2023.
  • Suncor Energy's Construction in Progress' 5-year high stood at $5.8 billion during Q4 2023, with a 5-year trough of $3.6 billion in Q4 2021.
  • Its 5-year average for Construction in Progress is $4.7 billion, with a median of $4.6 billion in 2022.
  • As far as peak fluctuations go, Suncor Energy's Construction in Progress tumbled by 958.79% in 2020, and later skyrocketed by 2717.97% in 2022.
  • Over the past 5 years, Suncor Energy's Construction in Progress (Quarter) stood at $3.8 billion in 2020, then fell by 4.85% to $3.6 billion in 2021, then increased by 27.18% to $4.6 billion in 2022, then grew by 25.03% to $5.8 billion in 2023, then decreased by 3.78% to $5.6 billion in 2024.
  • Its Construction in Progress stands at $5.6 billion for Q4 2024, versus $5.8 billion for Q4 2023 and $4.6 billion for Q4 2022.