Suncor Energy (SU) Construction in Progress (2016 - 2025)
Suncor Energy (SU) has disclosed Construction in Progress for 9 consecutive years, with $4.0 billion as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 17.5% to $4.0 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $4.0 billion, a 17.5% decrease, with the full-year FY2025 number at $4.0 billion, down 19.3% from a year prior.
- Construction in Progress was $4.0 billion for Q4 2025 at Suncor Energy, down from $4.9 billion in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $5.8 billion in Q4 2023 to a low of $3.6 billion in Q4 2021.
- A 5-year average of $4.6 billion and a median of $4.6 billion in 2022 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: grew 27.18% in 2022, then fell 17.5% in 2025.
- Suncor Energy's Construction in Progress stood at $3.6 billion in 2021, then increased by 27.18% to $4.6 billion in 2022, then grew by 25.03% to $5.8 billion in 2023, then decreased by 16.11% to $4.9 billion in 2024, then dropped by 17.5% to $4.0 billion in 2025.
- Per Business Quant, the three most recent readings for SU's Construction in Progress are $4.0 billion (Q4 2025), $4.9 billion (Q4 2024), and $5.8 billion (Q4 2023).