Growth Metrics

Shell (SHEL) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Shell (SHEL) over the last 9 years, with Q4 2024 value amounting to $27.9 billion.

  • Shell's Construction in Progress fell 100.59% to $27.9 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $27.9 billion, marking a year-over-year decrease of 100.59%. This contributed to the annual value of $27.9 billion for FY2024, which is 100.59% down from last year.
  • According to the latest figures from Q4 2024, Shell's Construction in Progress is $27.9 billion, which was down 100.59% from $28.1 billion recorded in Q4 2023.
  • Over the past 5 years, Shell's Construction in Progress peaked at $37.0 billion during Q4 2021, and registered a low of $27.3 billion during Q4 2022.
  • For the 5-year period, Shell's Construction in Progress averaged around $30.4 billion, with its median value being $28.1 billion (2023).
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 1706.68% in 2021, then plummeted by 2629.03% in 2022.
  • Over the past 5 years, Shell's Construction in Progress (Quarter) stood at $31.6 billion in 2020, then increased by 17.07% to $37.0 billion in 2021, then fell by 26.29% to $27.3 billion in 2022, then rose by 3.15% to $28.1 billion in 2023, then dropped by 1.01% to $27.9 billion in 2024.
  • Its Construction in Progress was $27.9 billion in Q4 2024, compared to $28.1 billion in Q4 2023 and $27.3 billion in Q4 2022.