Stratasys (SSYS) Construction in Progress: 2011-2024

  • Stratasys' Construction in Progress rose 95.88% to $4.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $4.7 million, marking a year-over-year increase of 95.88%. This contributed to the annual value of $4.7 million for FY2024, which is 95.88% up from last year.
  • Latest data reveals that Stratasys reported Construction in Progress of $4.7 million as of Q4 2024, which was up 95.88% from $2.4 million recorded in Q4 2023.
  • Stratasys' Construction in Progress' 5-year high stood at $4.7 million during Q4 2024, with a 5-year trough of $888,000 in Q4 2020.
  • For the 3-year period, Stratasys' Construction in Progress averaged around $3.4 million, with its median value being $3.0 million (2022).
  • In the last 5 years, Stratasys' Construction in Progress plummeted by 31.80% in 2020 and then surged by 105.18% in 2021.
  • Over the past 5 years, Stratasys' Construction in Progress (Quarterly) stood at $888,000 in 2020, then soared by 105.18% to $1.8 million in 2021, then surged by 65.64% to $3.0 million in 2022, then dropped by 21.17% to $2.4 million in 2023, then spiked by 95.88% to $4.7 million in 2024.
  • Its last three reported values are $4.7 million in Q4 2024, $2.4 million for Q4 2023, and $3.0 million during Q4 2022.