Growth Metrics

Sarepta Therapeutics (SRPT) Construction in Progress: 2013

  • Sarepta Therapeutics' Construction in Progress was N/A to $11.3 million in Q4 2013 from the same period last year, while for Dec 2013 it was $11.3 million, marking a year-over-year change of. This contributed to the annual value of $11.3 million for FY2013, which is N/A change from last year.
  • According to the latest figures from Q4 2013, Sarepta Therapeutics' Construction in Progress is $11.3 million.
  • In the past 5 years, Sarepta Therapeutics' Construction in Progress ranged from a high of $11.3 million in Q4 2013 and a low of $11.3 million during Q4 2013.
  • Moreover, its 1-year median value for Construction in Progress was $11.3 million (2013), whereas its average is $11.3 million.