SM Energy (SM) Construction in Progress (2016 - 2025)
SM Energy (SM) has disclosed Construction in Progress for 17 consecutive years, with $458.0 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 4.98% to $458.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $458.0 million, a 4.98% decrease, with the full-year FY2025 number at $458.0 million, down 4.98% from a year prior.
- Construction in Progress was $458.0 million for Q4 2025 at SM Energy, up from $424.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $537.5 million in Q1 2025 to a low of $142.3 million in Q3 2021.
- A 5-year average of $317.9 million and a median of $311.9 million in 2023 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: crashed 42.41% in 2021, then surged 94.22% in 2022.
- SM Energy's Construction in Progress stood at $148.4 million in 2021, then surged by 93.58% to $287.3 million in 2022, then rose by 24.65% to $358.1 million in 2023, then soared by 34.61% to $482.0 million in 2024, then dropped by 4.98% to $458.0 million in 2025.
- Per Business Quant, the three most recent readings for SM's Construction in Progress are $458.0 million (Q4 2025), $424.9 million (Q3 2025), and $395.5 million (Q2 2025).