Tanger (SKT) Construction in Progress (2016 - 2026)
Tanger has reported Construction in Progress over the past 18 years, most recently at $21.3 million for Q1 2026.
- Quarterly Construction in Progress rose 149.51% to $21.3 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $21.3 million through Mar 2026, up 149.51% year-over-year, with the annual reading at $18.2 million for FY2025, 143.85% up from the prior year.
- Construction in Progress was $21.3 million for Q1 2026 at Tanger, up from $18.2 million in the prior quarter.
- Over five years, Construction in Progress peaked at $128.4 million in Q3 2023 and troughed at $6.2 million in Q1 2022.
- The 5-year median for Construction in Progress is $18.2 million (2025), against an average of $30.2 million.
- Year-over-year, Construction in Progress surged 3574.73% in 2022 and then plummeted 92.66% in 2024.
- A 5-year view of Construction in Progress shows it stood at $27.3 million in 2022, then grew by 6.81% to $29.2 million in 2023, then plummeted by 74.48% to $7.5 million in 2024, then surged by 143.85% to $18.2 million in 2025, then rose by 17.12% to $21.3 million in 2026.
- Per Business Quant, the three most recent readings for SKT's Construction in Progress are $21.3 million (Q1 2026), $18.2 million (Q4 2025), and $18.3 million (Q3 2025).