Tanger (SKT) Construction in Progress (2016 - 2025)

Tanger (SKT) has disclosed Construction in Progress for 17 consecutive years, with $18.2 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 1629.21% to $18.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $18.2 million, a 1629.21% increase, with the full-year FY2025 number at $18.2 million, up 1629.21% from a year prior.
  • Construction in Progress was $18.2 million for Q4 2025 at Tanger, down from $18.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $128.4 million in Q3 2023 to a low of $681000.0 in Q4 2022.
  • A 5-year average of $24.4 million and a median of $13.3 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 4187.96% in 2023, then plummeted 96.4% in 2024.
  • Tanger's Construction in Progress stood at $847000.0 in 2021, then fell by 19.6% to $681000.0 in 2022, then surged by 4187.96% to $29.2 million in 2023, then tumbled by 96.4% to $1.1 million in 2024, then soared by 1629.21% to $18.2 million in 2025.
  • Per Business Quant, the three most recent readings for SKT's Construction in Progress are $18.2 million (Q4 2025), $18.3 million (Q3 2025), and $11.7 million (Q2 2025).