Tanger (SKT) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Tanger (SKT) over the last 17 years, with Q3 2025 value amounting to $18.3 million.
- Tanger's Construction in Progress rose 9435.3% to $18.3 million in Q3 2025 from the same period last year, while for Sep 2025 it was $18.3 million, marking a year-over-year increase of 9435.3%. This contributed to the annual value of $7.5 million for FY2024, which is 7447.69% down from last year.
- Per Tanger's latest filing, its Construction in Progress stood at $18.3 million for Q3 2025, which was up 9435.3% from $11.7 million recorded in Q2 2025.
- Tanger's Construction in Progress' 5-year high stood at $128.4 million during Q3 2023, with a 5-year trough of $744000.0 in Q4 2021.
- Its 5-year average for Construction in Progress is $25.2 million, with a median of $13.3 million in 2022.
- In the last 5 years, Tanger's Construction in Progress soared by 357473.12% in 2022 and then crashed by 9266.05% in 2024.
- Tanger's Construction in Progress (Quarter) stood at $744000.0 in 2021, then surged by 3574.73% to $27.3 million in 2022, then grew by 6.81% to $29.2 million in 2023, then tumbled by 74.48% to $7.5 million in 2024, then skyrocketed by 145.67% to $18.3 million in 2025.
- Its Construction in Progress stands at $18.3 million for Q3 2025, versus $11.7 million for Q2 2025 and $8.5 million for Q1 2025.