Tanger (SKT) Construction in Progress (2016 - 2025)

Tanger (SKT) has disclosed Construction in Progress for 17 consecutive years, with $18.2 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 143.85% to $18.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $18.2 million through Dec 2025, up 143.85% year-over-year, with the annual reading at $18.2 million for FY2025, 143.85% up from the prior year.
  • Construction in Progress for Q4 2025 was $18.2 million at Tanger, down from $18.3 million in the prior quarter.
  • The five-year high for Construction in Progress was $128.4 million in Q3 2023, with the low at $847000.0 in Q3 2021.
  • Average Construction in Progress over 5 years is $26.1 million, with a median of $14.1 million recorded in 2022.
  • The sharpest move saw Construction in Progress skyrocketed 1568.6% in 2022, then tumbled 92.66% in 2024.
  • Over 5 years, Construction in Progress stood at $847000.0 in 2021, then surged by 3127.86% to $27.3 million in 2022, then rose by 6.81% to $29.2 million in 2023, then crashed by 74.48% to $7.5 million in 2024, then skyrocketed by 143.85% to $18.2 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $18.2 million, $18.3 million, and $11.7 million for Q4 2025, Q3 2025, and Q2 2025 respectively.