Silicon Motion Technology (SIMO) Construction in Progress (2016 - 2024)
Silicon Motion Technology (SIMO) has disclosed Construction in Progress for 12 consecutive years, with $63.3 million as the latest value for Q4 2024.
- For Q4 2024, Construction in Progress rose 31.61% year-over-year to $63.3 million; the TTM value through Dec 2024 reached $63.3 million, up 31.61%, while the annual FY2024 figure was $63.3 million, 31.61% up from the prior year.
- Construction in Progress hit $63.3 million in Q4 2024 for Silicon Motion Technology, up from $48.1 million in the prior quarter.
- Across five years, Construction in Progress topped out at $63.3 million in Q4 2024 and bottomed at $493000.0 in Q4 2020.
- Average Construction in Progress over 5 years is $27.6 million, with a median of $19.9 million recorded in 2022.
- Year-over-year, Construction in Progress soared 1171.6% in 2021 and then soared 31.61% in 2024.
- Silicon Motion Technology's Construction in Progress stood at $493000.0 in 2020, then skyrocketed by 1171.6% to $6.3 million in 2021, then soared by 217.74% to $19.9 million in 2022, then surged by 141.28% to $48.1 million in 2023, then skyrocketed by 31.61% to $63.3 million in 2024.
- According to Business Quant data, Construction in Progress over the past three periods came in at $63.3 million, $48.1 million, and $19.9 million for Q4 2024, Q4 2023, and Q4 2022 respectively.