Stepan (SCL) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Stepan (SCL) over the last 15 years, with Q4 2024 value amounting to $275.0 million.
- Stepan's Construction in Progress fell 3130.11% to $275.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $275.0 million, marking a year-over-year decrease of 3130.11%. This contributed to the annual value of $275.0 million for FY2024, which is 3130.11% down from last year.
- Stepan's Construction in Progress amounted to $275.0 million in Q4 2024, which was down 3130.11% from $400.4 million recorded in Q4 2023.
- In the past 5 years, Stepan's Construction in Progress registered a high of $400.4 million during Q4 2023, and its lowest value of $120.6 million during Q4 2020.
- For the 5-year period, Stepan's Construction in Progress averaged around $283.9 million, with its median value being $275.0 million (2024).
- Per our database at Business Quant, Stepan's Construction in Progress soared by 9696.2% in 2021 and then tumbled by 3130.11% in 2024.
- Over the past 5 years, Stepan's Construction in Progress (Quarter) stood at $120.6 million in 2020, then surged by 96.96% to $237.5 million in 2021, then surged by 62.54% to $386.1 million in 2022, then rose by 3.69% to $400.4 million in 2023, then plummeted by 31.3% to $275.0 million in 2024.
- Its Construction in Progress was $275.0 million in Q4 2024, compared to $400.4 million in Q4 2023 and $386.1 million in Q4 2022.