Stepan (SCL) Construction in Progress (2016 - 2025)
Stepan's Construction in Progress history spans 16 years, with the latest figure at $112.9 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 58.95% year-over-year to $112.9 million; the TTM value through Dec 2025 reached $112.9 million, down 58.95%, while the annual FY2025 figure was $112.9 million, 58.95% down from the prior year.
- Construction in Progress reached $112.9 million in Q4 2025 per SCL's latest filing, down from $275.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $400.4 million in Q4 2023 to a low of $112.9 million in Q4 2025.
- Average Construction in Progress over 5 years is $282.4 million, with a median of $275.0 million recorded in 2024.
- Peak YoY movement for Construction in Progress: soared 96.96% in 2021, then plummeted 58.95% in 2025.
- A 5-year view of Construction in Progress shows it stood at $237.5 million in 2021, then skyrocketed by 62.54% to $386.1 million in 2022, then rose by 3.69% to $400.4 million in 2023, then crashed by 31.3% to $275.0 million in 2024, then tumbled by 58.95% to $112.9 million in 2025.
- Per Business Quant, the three most recent readings for SCL's Construction in Progress are $112.9 million (Q4 2025), $275.0 million (Q4 2024), and $400.4 million (Q4 2023).