Growth Metrics

Rayonier (RYN) Construction in Progress (2016 - 2025)

Rayonier has reported Construction in Progress over the past 16 years, most recently at $2.4 million for Q4 2025.

  • Quarterly results put Construction in Progress at $2.4 million for Q4 2025, up 206.29% from a year ago — trailing twelve months through Dec 2025 was $2.4 million (up 206.29% YoY), and the annual figure for FY2025 was $2.4 million, up 206.29%.
  • Construction in Progress for Q4 2025 was $2.4 million at Rayonier, up from $1.3 million in the prior quarter.
  • Over the last five years, Construction in Progress for RYN hit a ceiling of $2.4 million in Q4 2025 and a floor of $460000.0 in Q4 2021.
  • Median Construction in Progress over the past 5 years was $830000.0 (2023), compared with a mean of $1.1 million.
  • Peak annual rise in Construction in Progress hit 206.29% in 2025, while the deepest fall reached 62.26% in 2025.
  • Rayonier's Construction in Progress stood at $460000.0 in 2021, then surged by 41.96% to $653000.0 in 2022, then skyrocketed by 181.93% to $1.8 million in 2023, then tumbled by 57.69% to $779000.0 in 2024, then surged by 206.29% to $2.4 million in 2025.
  • The last three reported values for Construction in Progress were $2.4 million (Q4 2025), $1.3 million (Q3 2025), and $776000.0 (Q2 2025) per Business Quant data.