St Joe (JOE) Construction in Progress (2016 - 2024)
Historic Construction in Progress for St Joe (JOE) over the last 15 years, with Q4 2024 value amounting to $650000.0.
- St Joe's Construction in Progress fell 3165.09% to $650000.0 in Q4 2024 from the same period last year, while for Dec 2024 it was $650000.0, marking a year-over-year decrease of 3165.09%. This contributed to the annual value of $650000.0 for FY2024, which is 3165.09% down from last year.
- St Joe's Construction in Progress amounted to $650000.0 in Q4 2024, which was down 3165.09% from $951000.0 recorded in Q4 2023.
- In the past 5 years, St Joe's Construction in Progress ranged from a high of $1.5 million in Q4 2021 and a low of $650000.0 during Q4 2024
- Over the past 5 years, St Joe's median Construction in Progress value was $775000.0 (recorded in 2022), while the average stood at $919200.0.
- In the last 5 years, St Joe's Construction in Progress surged by 11578.95% in 2021 and then tumbled by 4891.23% in 2022.
- St Joe's Construction in Progress (Quarter) stood at $703000.0 in 2020, then soared by 115.79% to $1.5 million in 2021, then tumbled by 48.91% to $775000.0 in 2022, then increased by 22.71% to $951000.0 in 2023, then crashed by 31.65% to $650000.0 in 2024.
- Its last three reported values are $650000.0 in Q4 2024, $951000.0 for Q4 2023, and $775000.0 during Q4 2022.