Farmland Partners (FPI) Construction in Progress (2016 - 2025)
Farmland Partners has reported Construction in Progress over the past 11 years, most recently at $1.2 million for Q4 2025.
- Quarterly results put Construction in Progress at $1.2 million for Q4 2025, down 19.81% from a year ago — trailing twelve months through Dec 2025 was $1.2 million (down 19.81% YoY), and the annual figure for FY2025 was $1.2 million, down 19.81%.
- Construction in Progress for Q4 2025 was $1.2 million at Farmland Partners, down from $1.3 million in the prior quarter.
- Over the last five years, Construction in Progress for FPI hit a ceiling of $15.2 million in Q1 2023 and a floor of $1.2 million in Q4 2025.
- Median Construction in Progress over the past 5 years was $8.1 million (2021), compared with a mean of $7.3 million.
- Biggest five-year swings in Construction in Progress: soared 39.12% in 2022 and later plummeted 88.19% in 2024.
- Farmland Partners' Construction in Progress stood at $10.6 million in 2021, then surged by 39.1% to $14.8 million in 2022, then plummeted by 69.93% to $4.5 million in 2023, then tumbled by 66.67% to $1.5 million in 2024, then decreased by 19.81% to $1.2 million in 2025.
- The last three reported values for Construction in Progress were $1.2 million (Q4 2025), $1.3 million (Q3 2025), and $1.4 million (Q2 2025) per Business Quant data.