Rythm (RYM) Construction in Progress (2021 - 2024)
Historic Construction in Progress for Rythm (RYM) over the last 4 years, with Q3 2024 value amounting to $2.9 million.
- Rythm's Construction in Progress fell 54.37% to $2.9 million in Q3 2024 from the same period last year, while for Sep 2024 it was $2.9 million, marking a year-over-year decrease of 54.37%. This contributed to the annual value of $31000.0 for FY2023, which is 9958.35% down from last year.
- Latest data reveals that Rythm reported Construction in Progress of $2.9 million as of Q3 2024, which was down 54.37% from $2.9 million recorded in Q2 2024.
- In the past 5 years, Rythm's Construction in Progress registered a high of $10.5 million during Q3 2022, and its lowest value of $31000.0 during Q4 2023.
- Moreover, its 4-year median value for Construction in Progress was $3.1 million (2021), whereas its average is $4.7 million.
- Its Construction in Progress has fluctuated over the past 5 years, first surged by 13000.62% in 2022, then crashed by 9958.35% in 2023.
- Over the past 4 years, Rythm's Construction in Progress (Quarter) stood at $3.2 million in 2021, then soared by 130.01% to $7.4 million in 2022, then plummeted by 99.58% to $31000.0 in 2023, then surged by 9341.94% to $2.9 million in 2024.
- Its Construction in Progress stands at $2.9 million for Q3 2024, versus $2.9 million for Q2 2024 and $2.9 million for Q1 2024.