Growth Metrics

Ryerson Holding (RYI) Construction in Progress (2016 - 2025)

Ryerson Holding's Construction in Progress history spans 13 years, with the latest figure at $24.1 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 4.33% year-over-year to $24.1 million; the TTM value through Dec 2025 reached $24.1 million, up 4.33%, while the annual FY2025 figure was $24.1 million, 4.33% up from the prior year.
  • Construction in Progress for Q4 2025 was $24.1 million at Ryerson Holding, up from $23.1 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $83.4 million in Q4 2022 and bottomed at $23.1 million in Q4 2024.
  • The 5-year median for Construction in Progress is $47.4 million (2021), against an average of $49.1 million.
  • The largest annual shift saw Construction in Progress skyrocketed 226.9% in 2021 before it tumbled 65.88% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $47.4 million in 2021, then skyrocketed by 75.95% to $83.4 million in 2022, then fell by 18.82% to $67.7 million in 2023, then crashed by 65.88% to $23.1 million in 2024, then increased by 4.33% to $24.1 million in 2025.
  • Per Business Quant, the three most recent readings for RYI's Construction in Progress are $24.1 million (Q4 2025), $23.1 million (Q4 2024), and $67.7 million (Q4 2023).