Growth Metrics

Ranger Energy Services (RNGR) Construction in Progress (2018 - 2025)

Ranger Energy Services' Construction in Progress history spans 8 years, with the latest figure at $10.6 million for Q4 2025.

  • For Q4 2025, Construction in Progress changed 0.0% year-over-year to $10.6 million; the TTM value through Dec 2025 reached $10.6 million, changed 0.0%, while the annual FY2025 figure was $10.6 million, 0.0% changed from the prior year.
  • Construction in Progress reached $10.6 million in Q4 2025 per RNGR's latest filing, down from $11.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $21.6 million in Q4 2023 to a low of $1.7 million in Q2 2021.
  • Average Construction in Progress over 5 years is $9.1 million, with a median of $10.4 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: plummeted 81.44% in 2021, then surged 554.55% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $2.9 million in 2021, then increased by 13.79% to $3.3 million in 2022, then soared by 554.55% to $21.6 million in 2023, then plummeted by 50.93% to $10.6 million in 2024, then changed by 0.0% to $10.6 million in 2025.
  • Per Business Quant, the three most recent readings for RNGR's Construction in Progress are $10.6 million (Q4 2025), $11.2 million (Q3 2025), and $10.5 million (Q2 2025).