Ranger Energy Services (RNGR) Construction in Progress (2018 - 2026)
Ranger Energy Services filings provide 9 years of Construction in Progress readings, the most recent being $23.4 million for Q1 2026.
- On a quarterly basis, Construction in Progress rose 110.81% to $23.4 million in Q1 2026 year-over-year; TTM through Mar 2026 was $23.4 million, a 110.81% increase, with the full-year FY2025 number at $10.6 million, changed 0.0% from a year prior.
- Construction in Progress hit $23.4 million in Q1 2026 for Ranger Energy Services, up from $10.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $23.4 million in Q1 2026 to a low of $2.6 million in Q1 2022.
- Median Construction in Progress over the past 5 years was $10.6 million (2024), compared with a mean of $11.6 million.
- Biggest five-year swings in Construction in Progress: soared 554.55% in 2023 and later plummeted 50.93% in 2024.
- Ranger Energy Services' Construction in Progress stood at $3.3 million in 2022, then soared by 554.55% to $21.6 million in 2023, then plummeted by 50.93% to $10.6 million in 2024, then changed by 0.0% to $10.6 million in 2025, then skyrocketed by 120.75% to $23.4 million in 2026.
- The last three reported values for Construction in Progress were $23.4 million (Q1 2026), $10.6 million (Q4 2025), and $11.2 million (Q3 2025) per Business Quant data.