Growth Metrics

Transocean (RIG) Construction in Progress (2018 - 2024)

Historic Construction in Progress for Transocean (RIG) over the last 7 years, with Q4 2024 value amounting to $76.0 million.

  • Transocean's Construction in Progress fell 8544.06% to $76.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $76.0 million, marking a year-over-year decrease of 8544.06%. This contributed to the annual value of $76.0 million for FY2024, which is 8544.06% down from last year.
  • According to the latest figures from Q4 2024, Transocean's Construction in Progress is $76.0 million, which was down 8544.06% from $69.0 million recorded in Q3 2024.
  • Over the past 5 years, Transocean's Construction in Progress peaked at $1.6 billion during Q3 2022, and registered a low of $69.0 million during Q3 2024.
  • For the 5-year period, Transocean's Construction in Progress averaged around $773.1 million, with its median value being $866.0 million (2021).
  • In the last 5 years, Transocean's Construction in Progress surged by 6603.77% in 2022 and then tumbled by 8870.32% in 2023.
  • Transocean's Construction in Progress (Quarter) stood at $828.0 million in 2020, then rose by 22.83% to $1.0 billion in 2021, then rose by 17.5% to $1.2 billion in 2022, then crashed by 56.32% to $522.0 million in 2023, then tumbled by 85.44% to $76.0 million in 2024.
  • Its Construction in Progress was $76.0 million in Q4 2024, compared to $69.0 million in Q3 2024 and $188.0 million in Q2 2024.