Transocean (RIG) Construction in Progress (2018 - 2024)

Transocean (RIG) has disclosed Construction in Progress for 7 consecutive years, with $76.0 million as the latest value for Q4 2024.

  • Quarterly Construction in Progress fell 85.44% to $76.0 million in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $76.0 million through Dec 2024, down 85.44% year-over-year, with the annual reading at $76.0 million for FY2024, 85.44% down from the prior year.
  • Construction in Progress for Q4 2024 was $76.0 million at Transocean, up from $69.0 million in the prior quarter.
  • The five-year high for Construction in Progress was $1.6 billion in Q3 2022, with the low at $69.0 million in Q3 2024.
  • Average Construction in Progress over 5 years is $773.1 million, with a median of $866.0 million recorded in 2021.
  • The sharpest move saw Construction in Progress soared 66.04% in 2022, then crashed 88.7% in 2023.
  • Over 5 years, Construction in Progress stood at $828.0 million in 2020, then increased by 22.83% to $1.0 billion in 2021, then rose by 17.5% to $1.2 billion in 2022, then crashed by 56.32% to $522.0 million in 2023, then tumbled by 85.44% to $76.0 million in 2024.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $76.0 million, $69.0 million, and $188.0 million for Q4 2024, Q3 2024, and Q2 2024 respectively.