Growth Metrics

Rafael Holdings (RFL) Construction in Progress (2017 - 2019)

Rafael Holdings (RFL) has disclosed Construction in Progress for 2 consecutive years, with $1.1 million as the latest value for Q2 2019.

  • On a quarterly basis, Construction in Progress changed N/A to $1.1 million in Q2 2019 year-over-year; TTM through Apr 2019 was $1.1 million, a N/A change, with the full-year FY2018 number at $1.0 million, changed N/A from a year prior.
  • Construction in Progress was $1.1 million for Q2 2019 at Rafael Holdings, up from $1.1 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.1 million in Q2 2019 to a low of $1.0 million in Q3 2018.