Cash Flow Statement
Growth Metrics

Rafael Holdings (RFL) Construction in Progress (2017 - 2019)

Rafael Holdings has reported Construction in Progress over the past 3 years, most recently at $1.1 million for Q2 2019.

  • Quarterly Construction in Progress changed N/A to $1.1 million in Q2 2019 from the year-ago period, while the trailing twelve-month figure was $1.1 million through Apr 2019, changed N/A year-over-year, with the annual reading at $1.0 million for FY2018, 24.42% up from the prior year.
  • Construction in Progress was $1.1 million for Q2 2019 at Rafael Holdings, up from $1.1 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.1 million in Q2 2019 and troughed at $823000.0 in Q3 2017.
  • The 3-year median for Construction in Progress is $1.1 million (2018), against an average of $1.0 million.
  • The largest YoY upside for Construction in Progress was 24.42% in 2018 against a maximum downside of 24.42% in 2018.
  • A 3-year view of Construction in Progress shows it stood at $823000.0 in 2017, then skyrocketed by 30.13% to $1.1 million in 2018, then rose by 2.24% to $1.1 million in 2019.
  • Per Business Quant, the three most recent readings for RFL's Construction in Progress are $1.1 million (Q2 2019), $1.1 million (Q1 2019), and $1.1 million (Q4 2018).