Rexford Industrial Realty (REXR) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Rexford Industrial Realty (REXR) over the last 12 years, with Q4 2025 value amounting to $451.1 million.

  • Rexford Industrial Realty's Construction in Progress rose 3518.8% to $451.1 million in Q4 2025 from the same period last year, while for Dec 2025 it was $451.1 million, marking a year-over-year increase of 3518.8%. This contributed to the annual value of $451.1 million for FY2025, which is 3518.8% up from last year.
  • As of Q4 2025, Rexford Industrial Realty's Construction in Progress stood at $451.1 million, which was up 3518.8% from $475.1 million recorded in Q3 2025.
  • In the past 5 years, Rexford Industrial Realty's Construction in Progress registered a high of $475.1 million during Q3 2025, and its lowest value of $33.2 million during Q2 2021.
  • In the last 5 years, Rexford Industrial Realty's Construction in Progress had a median value of $157.7 million in 2023 and averaged $213.0 million.
  • Within the past 5 years, the most significant YoY rise in Rexford Industrial Realty's Construction in Progress was 18146.94% (2021), while the steepest drop was 1658.3% (2021).
  • Rexford Industrial Realty's Construction in Progress (Quarter) stood at $71.4 million in 2021, then skyrocketed by 55.42% to $110.9 million in 2022, then surged by 116.35% to $240.0 million in 2023, then surged by 39.03% to $333.7 million in 2024, then soared by 35.19% to $451.1 million in 2025.
  • Its last three reported values are $451.1 million in Q4 2025, $475.1 million for Q3 2025, and $431.8 million during Q2 2025.