Growth Metrics

Dr Reddys Laboratories (RDY) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Dr Reddys Laboratories (RDY) over the last 10 years, with Q1 2025 value amounting to $277.1 million.

  • Dr Reddys Laboratories' Construction in Progress rose 7032.29% to $277.1 million in Q1 2025 from the same period last year, while for Mar 2025 it was $277.1 million, marking a year-over-year increase of 7032.29%. This contributed to the annual value of $283.9 million for FY2025, which is 7394.76% up from last year.
  • Dr Reddys Laboratories' Construction in Progress amounted to $277.1 million in Q1 2025, which was up 7032.29% from $162.7 million recorded in Q1 2024.
  • Over the past 5 years, Dr Reddys Laboratories' Construction in Progress peaked at $277.1 million during Q1 2025, and registered a low of $118.6 million during Q1 2023.
  • In the last 5 years, Dr Reddys Laboratories' Construction in Progress had a median value of $157.8 million in 2022 and averaged $161.8 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 11717.83% in 2021, then plummeted by 2481.21% in 2023.
  • Dr Reddys Laboratories' Construction in Progress (Quarter) stood at $158.9 million in 2021, then dropped by 0.68% to $157.8 million in 2022, then decreased by 19.63% to $126.8 million in 2023, then increased by 28.28% to $162.7 million in 2024, then soared by 70.32% to $277.1 million in 2025.
  • Its Construction in Progress was $277.1 million in Q1 2025, compared to $162.7 million in Q1 2024 and $126.8 million in Q3 2023.