Quad (QUAD) Construction in Progress (2016 - 2025)
Quad's Construction in Progress history spans 12 years, with the latest figure at $18.0 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 9.09% year-over-year to $18.0 million; the TTM value through Dec 2025 reached $18.0 million, down 9.09%, while the annual FY2025 figure was $18.0 million, 9.09% down from the prior year.
- Construction in Progress for Q4 2025 was $18.0 million at Quad, down from $19.8 million in the prior quarter.
- Across five years, Construction in Progress topped out at $34.6 million in Q4 2023 and bottomed at $18.0 million in Q4 2025.
- The 5-year median for Construction in Progress is $25.1 million (2021), against an average of $25.6 million.
- The largest annual shift saw Construction in Progress rose 21.51% in 2022 before it plummeted 42.77% in 2024.
- A 5-year view of Construction in Progress shows it stood at $25.1 million in 2021, then grew by 21.51% to $30.5 million in 2022, then grew by 13.44% to $34.6 million in 2023, then tumbled by 42.77% to $19.8 million in 2024, then fell by 9.09% to $18.0 million in 2025.
- Per Business Quant, the three most recent readings for QUAD's Construction in Progress are $18.0 million (Q4 2025), $19.8 million (Q4 2024), and $34.6 million (Q4 2023).