KPIs & Operating Metrics(New)
Cash Flow Statement
Growth Metrics

Sirius Xm Holdings (SIRI) Construction in Progress (2016 - 2026)

Sirius Xm Holdings has reported Construction in Progress over the past 17 years, most recently at $691.0 million for Q1 2026.

  • For Q1 2026, Construction in Progress fell 21.03% year-over-year to $691.0 million; the TTM value through Mar 2026 reached $691.0 million, down 21.03%, while the annual FY2025 figure was $565.0 million, 42.81% down from the prior year.
  • Construction in Progress for Q1 2026 was $691.0 million at Sirius Xm Holdings, up from $565.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.1 billion in Q3 2024 and troughed at $242.0 million in Q1 2022.
  • A 5-year average of $643.8 million and a median of $691.0 million in 2026 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: skyrocketed 100.64% in 2022 and later tumbled 42.81% in 2025.
  • Year by year, Construction in Progress stood at $313.0 million in 2022, then soared by 71.88% to $538.0 million in 2023, then skyrocketed by 83.64% to $988.0 million in 2024, then tumbled by 42.81% to $565.0 million in 2025, then increased by 22.3% to $691.0 million in 2026.
  • Business Quant data shows Construction in Progress for SIRI at $691.0 million in Q1 2026, $565.0 million in Q4 2025, and $758.0 million in Q3 2025.